Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: T02CM03367
Permit Details
Apply Date:
07/16/2002
Applicant:
CITY OF TUCSON FIRE DEPARTMENT
Description:
NEW:BURN PIT BUILDING
Permit Reviews
Permit Number - T02CM03367
Permit Status: Withdrwn
Permit Description: NEW:BURN PIT BUILDING
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/02/2003 | RESUBMITTAL | 03/11/2003 | COMPLETED |
| 03/11/2003 | RESUBMITTAL | 04/14/2003 | STOPPED |
| 07/16/2002 | SITE | 03/11/2003 | ACTIVE |
| 07/16/2002 | COMMERCIAL NEW | 01/02/2003 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T02CM03367
Permit Status: Withdrwn
Permit Description: NEW:BURN PIT BUILDING
Total Outstanding Activity Conditions - 9
| Date | Name |
|---|---|
| 07/16/2002 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
| 09/19/2002 | SPECIAL INSPECTION FOR CONCRETE IS REQUIRED.. |
| 09/19/2002 | SPECIAL INSPECTION FOR REINFORCING STEEL AND/OR PRE-STRESSING TENDONS IS REQUIRED. |
| 09/19/2002 | SPECIAL INSPECTION FOR STRUCTURAL WELDING IS REQUIRED. |
| 09/19/2002 | SPECIAL INSPECTION FOR HIGH STRENGTH BOLTING IS REQUIRED. |
| 10/08/2002 | City of Tucson Development Standards Section No.2-03.2.4.L.5: Approval documentation and permits from other jurisdictions for acceptance of proposed construction shall be obtained. |
| 10/08/2002 | Offsite disposal location for overexcavated soils and other deleterious materials shall be placed in an approved and permitted site. |
| 10/08/2002 | Proposed project exceeds 5 acres and is subject to NPDES requirements. Contact Loren Makus, 791-4251 for submittal requirements. |
| 10/08/2002 | IBC Chapter 36, Section 9: A Grading Plan submittal is required to obtain the grading permit. |
Outstanding Inspections
Permit Status: Withdrwn
Permit Number: T02CM03367
Permite Description: NEW:BURN PIT BUILDING
Total Outstanding Inspections - 19
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| ELECTRIC - UFER | N/A | Not Inspected | ||
| ELECTRIC - UNDERGROUND | N/A | Not Inspected | ||
| ELECTRIC - INTERMEDIATE | N/A | Not Inspected | ||
| ELECTRIC - ABOVE CEILING | N/A | Not Inspected | ||
| ELECTRIC - CONSTRUCTION POWER | N/A | Not Inspected | ||
| ELECTRIC - FINAL | N/A | Not Inspected | ||
| OUTDOOR LIGHTING FINAL | N/A | Not Inspected | ||
| PLUMBING - ROUGH, SOIL | N/A | Not Inspected | ||
| PLUMBING - INTERMEDIATE | N/A | Not Inspected | ||
| PLUMBING - ABOVE CEILING | N/A | Not Inspected | ||
| PLUMBING - YARD WTR LINE/TEST | N/A | Not Inspected | ||
| PLUMBING - SEWER HCS CONNECT | N/A | Not Inspected | ||
| PLUMBING - PROGRESS | N/A | Not Inspected | ||
| PLUMBING - FINAL | N/A | Not Inspected | ||
| MECHANICAL - INTERMEDIATE | N/A | Not Inspected | ||
| MECHANICAL - ABOVE CEILING | N/A | Not Inspected | ||
| MECHANICAL - FINAL | N/A | Not Inspected | ||
| BOILER - HOT WTR STG TANK | N/A | Not Inspected | ||
| BOILER FINAL | N/A | Not Inspected |