Permit Details

Status:
Final
Type:
SINGLE FAMILY OTHER
Address:
10890 E 22ND ST
Address NEW:
10890 E 22ND ST
Apply Date:
04/23/2002
Applicant:
T J BEDNAR & COMPANY
Description:
SALES TRAILER:ELECTRIC:WATER
Contractors:
  • T J BEDNAR & COMPANY

Permit Reviews

Permit Number - T02CM02068
Permit Status: Final
Permit Description: SALES TRAILER:ELECTRIC:WATER
Start Date Submittal Complete Date Status  
04/23/2002 RESIDENTIAL BLDG/ZONING 04/23/2002 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - T02CM02068
Permit Status: Final
Permit Description: SALES TRAILER:ELECTRIC:WATER
Total Outstanding Activity Conditions - 1
Date Name
04/23/2002 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.

Completed Inspections

Permit Status: Final
Permit Number: T02CM02068
Permit Description: SALES TRAILER:ELECTRIC:WATER
Total Completed Inspections - 6
Date Description Inspector Results Comments
04/24/2002 ELECTRIC - TEMPORARY SERVICE MCAPISTR Approved IVRS - Inspection 0000*
04/24/2002 ELECTRIC - CABLE DROP MCAPISTR Approved IVRS - Inspection 0000*OK TO CLEAR.
04/25/2002 ELECTRIC - FINAL MCAPISTR Approved IVRS - Inspection 0000*
04/30/2002 PLUMBING - SEWER HCS CONNECT RMYERS Approved I WILL TRY AGAIN. THE SEWER SHALL BE TESTED WITH WATER FROM THE LOWEST POINT TO THE HIGHEST POINT THEREOF. THE HIGHEST POINT OF THE SEWER IS THE GROUND CLEAN OUT. SO, YOU HAD THAT RIGHT, BEFORE. YOU DO NOT NEED A TEN FOOT HEAD TEST. HOWEVER, ALL OF THE LOWER PORTION OF THE SEWER NEEDS TO BE TESTED. YOU CAN'T CUT YOUR TEST IN AND ELIMINATE 10 FEET OF PIPING THE TEST IS FOR ALL OF THE INSTALLED SEWER PIPING ALL THE WAY TO THE TRANSITION.
05/01/2002 PERMIT FINALED RMYERS Approved
05/01/2002 PLUMBING - FINAL RMYERS Approved IVRS - Inspection 0000*1.) BLDG SEWER FROM 2 WAY C.O. TO HCS CONNECTION OK WATER TEST OK TRANSITION FITTING OK 2.) OK TO BACKFILL 3.) PVC YARDWATER FROM METER TO BLDG OK PRESURE TEST OK 4.) OK TO COVER.

Documents

File Name Document Type  
T02CM02068 2025 MASS-UPLOAD.PDF DOCUMENTS VIEW
None DOCUMENTS VIEW