Inspection Status: Approved
Inspection History: PLUMBING - SEWER HCS CONNECT
| Date |
Description |
Inspector |
Results |
Comments |
| 04/30/2002 |
PLUMBING - SEWER HCS CONNECT |
|
Approved |
I WILL TRY AGAIN. THE SEWER SHALL BE TESTED WITH WATER FROM THE LOWEST POINT TO THE HIGHEST POINT THEREOF. THE HIGHEST POINT OF THE SEWER IS THE GROUND CLEAN OUT. SO, YOU HAD THAT RIGHT, BEFORE. YOU DO NOT NEED A TEN FOOT HEAD TEST. HOWEVER, ALL OF THE LOWER PORTION OF THE SEWER NEEDS TO BE TESTED. YOU CAN'T CUT YOUR TEST IN AND ELIMINATE 10 FEET OF PIPING THE TEST IS FOR ALL OF THE INSTALLED SEWER PIPING ALL THE WAY TO THE TRANSITION. |
| 04/29/2002 |
PLUMBING - SEWER HCS CONNECT |
|
Denied |
IVRS - Inspection 0999*1.) THE BLDG SEWER SHALL BE TESTED FROM THE LOWEST POINT, TO THE HIGHEST POINT THEREOF. PARTIAL WATER TEST TEST NOT APPROVED. |
| 04/25/2002 |
PLUMBING - SEWER HCS CONNECT |
|
Denied |
IVRS - Inspection 0999*/ 1) EXPOSE ALL OF THE HCS CONNECTIONS FOR INSPECTIONS 2) PROVIDE A WATER TEST ON THE SEWER LINE |
| 04/24/2002 |
PLUMBING - SEWER HCS CONNECT |
|
Denied |
IVRS - Inspection 0999*1.) NO WATER TEST ON SEWER 2.) WIPE OFF CONNECTION AT HCS FOR VISUAL VERIFICATION OF MATERIAL TYPES. |