Permit: T02BU00170
Permit Details
Apply Date:
01/22/2002
Applicant:
ALLIED HOMES
Description:
GRADING:200 CY CUT & 3000 CY FILL
Contractors:
- ALLIED HOMES INC
Permit Reviews
Permit Number - T02BU00170
Permit Status: Si_xpire
Permit Description: GRADING:200 CY CUT & 3000 CY FILL
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/07/2004 | GRADING | 02/04/2004 | COMPLETED |
| 01/22/2002 | GRADING | 08/09/2002 | COMPLETED |
| 01/24/2006 | REVISION - GRADING | 01/24/2006 | COMPLETED |
| 01/25/2006 | REVISION - GRADING | 03/03/2006 | COMPLETED |
| 02/04/2004 | RESUBMITTAL | 03/08/2004 | COMPLETED |
| 03/09/2004 | RESUBMITTAL | 03/12/2004 | COMPLETED |
| 03/28/2006 | REVISION - GRADING | 04/27/2006 | COMPLETED |
| 09/04/2002 | GRADING | 09/12/2002 | COMPLETED |
| 09/12/2002 | GRADING | 10/16/2002 | COMPLETED |
| 10/18/2002 | GRADING | 10/30/2002 | COMPLETED |
| 10/30/2002 | RESUBMITTAL | 11/13/2002 | COMPLETED |
| 11/14/2002 | RESUBMITTAL | 02/18/2003 | COMPLETED |
| 12/12/2003 | REVISION | 12/29/2003 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T02BU00170
Permit Status: Si_xpire
Permit Description: GRADING:200 CY CUT & 3000 CY FILL
Total Outstanding Activity Conditions - 11
| Date | Name |
|---|---|
| 01/22/2002 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
| 02/18/2004 | A COPY OF THE ADEQ CONSTRUCTION GENERAL PERMIT AND THE STORMWATER POLLUTION PREVENTION PLAN MUST BE AVAILABLE AT THE PROJECT SITE AT ALL TIMES. UPON REQUEST THE CONSTRUCTION GENERAL PERMIT, STORMWATER POLLUTION PREVENTION PLAN AND ALL REQUIRED RECORDS WILL BE MADE AVAILABLE TO ANY CITY OF TUCSON INSPECTOR |
| 02/18/2004 | THE DEVELOPER WILL PROVIDE A CURB ACCESS RAMP FOR ACCESS TO THE POWER LINE RIGHT-OF-WAY. THE CURB RAMP WILL BE CONSTRUCTED IN ACCORDANCE WITH COT/PC STANDARD DETAILS 209 AND 210. |
| 02/18/2004 | TEMPORARY OR PERMANENT ACCESS TO EXISTING RESIDENTIAL PARCELS SHALL BE PROVIDED AT ALL TIMES DURING CONSTRUCTION |
| 02/18/2004 | THE DEVELOPER AND GENERAL CONTRACTOR SUPERINTENDENT WILL MEET WITH DSD ENGINEERING DIVISION REPRESENTATIVES FOR A GRADING PRE-CONSTRUCTION MEETING AT THE DEVELOPMENT SERVICES DEPARTMENT OFFICE BEFORE RESUMING WORK ON THIS PROJECT. |
| 02/18/2004 | ANY NON-COMPLIANCE TO THIS PERMIT OR TUCSON CODES SHALL RESULT IN VIOLATION AND OR CITATION |
| 02/18/2004 | ANY CHANGES IN THE GRADING DESIGN MAY RESULT IN REVISION OF THE GRADING PLAN. CONTACT DSD ENGINEERING DIVISION (791-5550) FOR ANY PROPOSED CHANGES OR REVISIONS. |
| 03/05/2004 | CONSTRUCTION ACTIVITY SHALL NOT OCCUR BEYOND THE APPROVED GRADING LIMITS. |
| 03/05/2004 | THERE SHALL BE NO CONSTRUCTION ACTIVITY OUTSIDE OF THE PROJECT BOUNDARIES; AND NO CONSTRUCTION VEHICLES SHALL DRIVE ON, OR MATERIALS SHALL BE PLACED IN, THE OFFSITE NEIGHBORING ACCESS EASEMENT. |
| 03/28/2005 | Hold final inspection acceptance for Engineering reviewer (D Williams) |
| 04/05/2006 | FOR REVISED GRADING PERMIT T02BU00170-R, THE FOLLOWING CONDITIONS a-g APPLY: a) Call for Pre-construction meeting. For a DSD Engineering Inspection, call IVR (740-6970), or schedule with a Customer Service Representative at the Development Services Department, or contact DSD Engineering at 791-5550 extension 2101, or schedule inspections online at: http://www.ci.tucson.az.us/dsd/Online_Services/Online_Permits/online_permits.html b) For inspection purposes, please fill out the enclosed "AZPDES - Posting Requirements" green sheet, and post at construction entrance of the site at beginning of construction activities and maintain this posted document throughout project construction. c) A Geotechnical Engineering inspection will be required prior to final grading inspection if any cut slopes steeper than 2:1(H:V) are constructed, per September 17, 2004 Rock Slope Evaluation Geotechnical Letter by LMT. Special Inspection would be required by Geotechnical Engineer for 1:1(H:V) slopes, or any slopes steeper than 2:1(H:V). Copies of the Geotechnical Evaluation shall be submitted to DSD Engineering Division Inspector or office prior to scheduling Final Grading Inspection. d) Individual grading permits are required for each lot. e) As-built grading plans are required for the private street construction at final grading review for the subdivision. f) Any toedown or cut-off walls shall be inspected by DSD Inspector at time of or prior to backfill. g) See also Floodplain Use Permit T06OT00211. |
Completed Inspections
Permit Status: Si_xpire
Permit Number: T02BU00170
Permit Description: GRADING:200 CY CUT & 3000 CY FILL
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/10/2004 | NPPO PRE PERMIT INSPECTION | ACONNOR | Approved | |
| 11/30/2004 | STORMWATER FOLLOW-UP INSP | JBRUCKME | Approved | NO CONCERNS |
| 10/25/2007 | GRADING - FINAL | MRUSSO | Approved | |
| 04/23/2008 | PERMIT FINALED | LJACKSON | Approved |