Permit: T02BU00170


Addresses:

2905 W SPEEDWAY BL


Inspection Status: Approved

Inspection History: GRADING - FINAL

Permit Number - T02BU00170

Inspection Description - GRADING - FINAL

Inspection Status - Approved

Date Description Inspector Results Comments
10/25/2007 GRADING - FINAL Approved
10/03/2007 GRADING - FINAL Denied 1) PROVIDE A REVISED AS-BUILT/GRADING PLAN SHOWING ALL SIGNIFICANT CHANGES MADE TO THE ORIGINAL APPROVED GRADING PLAN.
2) PROVIDE A DRAINAGE CERTIFICATION STATEMENT FROM THE ENGINEER OF RECORD STATING THAT ALL DRAINAGE WAYS AND RET/DET BASINS ON SITE WERE BUILT IN ACCORDANCE WITH THE APPROVED GRADING PLAN.
3) COMPLETE RETENTION/DETENTION BASIN MAINTENANCE ACCESS PER PLAN (15' WIDE, ALL WEATHER SURFACE - CHIPSEAL).
4) REMOVE CONSTRUCTION DEBRIS AND TRASH FROM DRAINAGE CHANNEL CLOSEST TO CONSTRUCTION TRAILER.
5) COMPLETE ROCK RIP RAP ON NORTH SIDE SLOPE NEAR SCUPPER IN DRAINAGE CHANNEL CLOSEST TO CONSTR. TRAILER.
6) CLEAN OUT AROUND RETENTION/DETENTION BASIN INLET PIPE AND ADD ROCK AROUND INLET TO PREVENT SILTING-IN OF PIPE.
7) ADD SCREENING AROUND AND ON TOP OF RETENTION/DETENTION BASIN WEIR AN OUTLET STRUCTURE.
8) REMOVE ALL STORM WATER SEDIMENT CONTROLS STILL IN PLACE, EXCEPT FOR AREAS AROUND LOTS THAT HAVE NOT BEEN COMPLETED.
9) ADD HAND RAILING ALONG SCUPPER LOCATED ON SOUTH SIDE OF RET/DET BASIN.
10) REPAIR HANDICAP CURB RAMP AT ENCILLIA COURT.
11) REPAIR EROSION DAMAGE AT DRAINAGE CHANNEL LOCATED ON NORTH SIDE OF RET/DET BASIN.
12) COMPLETE SIDE WALK AND CURB RAMP AT CORNER OF LUTEA DR. AND SALVIA DR.
13) COMPLETE ANY CONDITIONS ASSOCIATED WITH THE APPROVED GRADING PERMIT.
06/02/2004 GRADING - FINAL Denied SWPPP CONTROLS ON DRAINAGE CHANNEL BETWEEN LOTS 30 & 31, AND 35 & 36 ARE INSTALLED PER THE DETAIL ON