Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: T01CM05743
Permit Details
Apply Date:
11/26/2001
Applicant:
N/A
Description:
REMODEL RETAIL 29'4" x 43'8" BUILDING, RETAIL W/ STORAGE ROOM, TWO ACCESSIBILE TOILET ROOMS,FURR OUT INTERIOR W/( METAL STUDS W/ GYP BD);INFILL ADOBE W/ WOOD STUDS W/ GYP BD; REPLACE INTERIOR BEARING WALLS W/ STEEL COLUMNS,CONCRETE FOOTINGS AND WOOD GLU-LAM BEAMS
Contractors:
- EDEN BUILDERS INC ,
Permit Reviews
Permit Number - T01CM05743
Permit Status: C of o
Permit Description: REMODEL RETAIL 29'4" x 43'8" BUILDING, RETAIL W/ STORAGE ROOM, TWO ACCESSIBILE TOILET ROOMS,FURR OUT INTERIOR W/( METAL STUDS W/ GYP BD);INFILL ADOBE W/ WOOD STUDS W/ GYP BD; REPLACE INTERIOR BEARING WALLS W/ STEEL COLUMNS,CONCRETE FOOTINGS AND WOOD GLU-LAM BEAMS
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/29/2002 | RESUBMITTAL | 01/31/2002 | COMPLETED |
| 02/07/2002 | RESUBMITTAL | 02/08/2002 | COMPLETED |
| 02/28/2002 | REVISION | 02/28/2002 | COMPLETED |
| 11/26/2001 | COMMERCIAL TI | 01/02/2002 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T01CM05743
Permit Status: C of o
Permit Description: REMODEL RETAIL 29'4" x 43'8" BUILDING, RETAIL W/ STORAGE ROOM, TWO ACCESSIBILE TOILET ROOMS,FURR OUT INTERIOR W/( METAL STUDS W/ GYP BD);INFILL ADOBE W/ WOOD STUDS W/ GYP BD; REPLACE INTERIOR BEARING WALLS W/ STEEL COLUMNS,CONCRETE FOOTINGS AND WOOD GLU-LAM BEAMS
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 11/26/2001 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: C of o
Permit Number: T01CM05743
Permit Description: REMODEL RETAIL 29'4" x 43'8" BUILDING, RETAIL W/ STORAGE ROOM, TWO ACCESSIBILE TOILET ROOMS,FURR OUT INTERIOR W/( METAL STUDS W/ GYP BD);INFILL ADOBE W/ WOOD STUDS W/ GYP BD; REPLACE INTERIOR BEARING WALLS W/ STEEL COLUMNS,CONCRETE FOOTINGS AND WOOD GLU-LAM BEAMS
Total Completed Inspections - 25
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/26/2002 | STEM WALL/RETAINING WALL | AMATHIES | Approved | IVRS - Inspection 0000* |
| 02/26/2002 | EXCAVATION/LAYOUT REBAR & ZON | AMATHIES | Approved | IVRS - Inspection 0000* |
| 03/05/2002 | PLUMBING - ROUGH, SOIL | TRINIVJR | Approved | 1.) SOIL WATER TEST IS OK 2.) P.O.C. OF NEW BLDG DRAIN TO EXSISTING BLDG. DRAIN IS OK 3.) OK FOR FLOORING. |
| 04/10/2002 | FRAMING | AMATHIES | Approved | IVRS - Inspection 0000* |
| 04/25/2002 | SHEET ROCK NAILING | AMATHIES | Approved | IVRS - Inspection 0000* |
| 06/03/2002 | MECHANICAL - INTERMEDIATE | CWILLIAM | Approved | IVRS - Inspection 0000*NOTE ACTUAL INSPECTION IS ABOVE CEILING GRID AND TILES. |
| 06/03/2002 | PLUMBING - PROGRESS | TRINIVJR | Approved | IVRS - Inspection 0000*1.) CLOSET RING HAS BEEN SET 2.) NOTE: VENT THRU ROOF MUST BE PAINTED AND A VACCUM BREAKER ON ALL EXTERIOR HOSE BIBBS @ TIME OF FINAL INSPECTION. |
| 06/03/2002 | ELECTRIC - ABOVE CEILING | DSANTACR | Approved | IVRS - Inspection 0000* |
| 06/07/2002 | MECHANICAL - FINAL | CWILLIAM | Approved | IVRS - Inspection 0000* |
| 06/19/2002 | PLUMBING - FINAL | TRINIVJR | Approved | IVRS - Inspection 0000*1.) PLBG. FINAL IS OK 2.) OK FOR C OF O. |
| 06/19/2002 | ELECTRIC - FINAL | MCAPISTR | Approved | IVRS - Inspection 0000*OK FOR C OF O. |
| 06/20/2002 | PLUMBING - GAS PRESSURE TEST | TRINIVJR | Approved | |
| 06/20/2002 | PLUMBING - INTERMEDIATE | TRINIVJR | Approved | |
| 06/20/2002 | ELECTRIC - INTERMEDIATE | DSANTACR | Approved | |
| 06/20/2002 | BUILDING - FINAL | AMATHIES | Approved | IVRS - Inspection 0000* |
| 06/20/2002 | BUILDING PRE-SLAB | AMATHIES | Approved | |
| 06/24/2002 | RIGHT OF WAY - FINAL | PWHIDDON | Approved | |
| 06/24/2002 | ENGINEERING - FINAL | DROBERTS | Approved | |
| 06/24/2002 | FIRE - FINAL | LTHOMAS | Approved | |
| 06/25/2002 | PERMIT FINALED | AMATHIES | Approved | |
| 06/25/2002 | SIGN - FINAL | JYBARRA | Approved | |
| 06/25/2002 | MECHANICAL - TEMP PWR FOR TEST | CWILLIAM | Approved | |
| 06/25/2002 | PLUMBING - TEMP POWER FOR TEST | TRINIVJR | Approved | |
| 06/25/2002 | ELECTRIC - TEMP POWER FOR TEST | MCAPISTR | Approved | |
| 06/25/2002 | BUILDING - TEMP POWER FOR TEST | AMATHIES | Approved |