Permit: T01CM02173
Permit Details
Apply Date:
05/07/2001
Applicant:
N/A
Description:
ADDITION:LAUNDRY FACILITY/BATH HOUSE/LOUNGE
Architects:
- FIELDS, JAMES SLOAN
Contractors:
- J 3 CONSTRUCTION L L C ,
Permit Reviews
Permit Number - T01CM02173
Permit Status: C of o
Permit Description: ADDITION:LAUNDRY FACILITY/BATH HOUSE/LOUNGE
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/24/2002 | REVISION | 04/29/2002 | COMPLETED |
| 05/07/2001 | 3RD PARTY REVIEW-COMMERCIAL | 09/04/2001 | COMPLETED |
| 05/07/2001 | SITE | 06/28/2001 | COMPLETED |
| 05/18/2001 | COMMERCIAL NEW | 09/07/2001 | COMPLETED |
| 08/08/2001 | SITE | 09/07/2001 | COMPLETED |
| 09/14/2001 | OTHER | 09/14/2001 | COMPLETED |
| 09/14/2001 | RESUBMITTAL | 09/18/2001 | COMPLETED |
| 11/28/2001 | REVISION | 11/28/2001 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T01CM02173
Permit Status: C of o
Permit Description: ADDITION:LAUNDRY FACILITY/BATH HOUSE/LOUNGE
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 05/07/2001 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: C of o
Permit Number: T01CM02173
Permit Description: ADDITION:LAUNDRY FACILITY/BATH HOUSE/LOUNGE
Total Completed Inspections - 40
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/10/2002 | BUILDING PRE-SLAB | RSUBA | Approved | IVRS - Inspection 0000* |
| 06/05/2002 | EXT METAL CLIPS/EXT SHEATHING | RSUBA | Approved | IVRS - Inspection 0000* |
| 07/08/2002 | PLUMBING - ABOVE CEILING | FMCCLURE | Approved | IVRS - Inspection 0000* |
| 07/12/2002 | MECHANICAL - INTERMEDIATE | JMILITEL | Approved | IVRS - Inspection 0000*1.) PROVIDE SECONDARY DRAINS ON FAN COILS. 2.) ALL CRIMPS ON DRYER VENTS MUST GO WITH THE AIR FLOW. |
| 07/15/2002 | PLUMBING - INTERMEDIATE | FMCCLURE | Approved | IVRS - Inspection 0000* |
| 07/23/2002 | U VALUE FOR WINDOW | RSUBA | Approved | IVRS - Inspection 0000* |
| 07/23/2002 | ROOF NAILING | RSUBA | Approved | IVRS - Inspection 0000* |
| 07/26/2002 | PLUMBING - ROUGH, SOIL | FMCCLURE | Approved | IVRS - Inspection 0000* |
| 07/26/2002 | SHEET ROCK NAILING | RSUBA | Approved | IVRS - Inspection 0000* |
| 08/01/2002 | PLUMBING - YARD WTR LINE/TEST | FMCCLURE | Approved | IVRS - Inspection 0000*BUILDING OF METER LOCATION OK. |
| 08/26/2002 | ELECTRIC - ABOVE CEILING | MCAPISTR | Approved | IVRS - Inspection 0000* |
| 08/30/2002 | FRAMING | RSUBA | Approved | IVRS - Inspection 0000* |
| 09/03/2002 | MECHANICAL - ABOVE CEILING | JMILITEL | Approved | IVRS - Inspection 0000* |
| 09/04/2002 | STUCCO MESH | RSUBA | Approved | IVRS - Inspection 0000* |
| 09/04/2002 | REINFORCED MASONRY PRE-GROUT | RSUBA | Approved | IVRS - Inspection 0000* |
| 09/12/2002 | MECHANICAL - TEMP PWR FOR TEST | JMILITEL | Approved | IVRS - Inspection 0000* |
| 09/12/2002 | PLUMBING - TEMP POWER FOR TEST | JSTANLEY | Approved | IVRS - Inspection 0000* |
| 09/12/2002 | ELECTRIC - TEMP POWER FOR TEST | MCAPISTR | Approved | IVRS - Inspection 0000* |
| 09/12/2002 | BUILDING - TEMP POWER FOR TEST | RSUBA | Approved | IVRS - Inspection 0000* |
| 09/19/2002 | ELECTRIC - UFER | MCAPISTR | Approved | IVRS - Inspection 0000*1.) GROUND GRID ABOUT NEW SERVICE EQUIPMENT. UFER AT BLDG SERVICE OK 2.) U/G PVC FOR PORCH COLUMN LITE OK B.) MOUNTED SERVICE EQUIPMENT OK. |
| 09/19/2002 | EXCAVATION/LAYOUT REBAR & ZON | RSUBA | Approved | IVRS - Inspection 0000* OK BATHHOUSE COLS (12). |
| 09/27/2002 | ELECTRIC - UNDERGROUND | DSANTACR | Approved | IVRS - Inspection 0920*COULD NOT LOCATE PLANS BLD LOCKED. |
| 10/02/2002 | ELECTRIC - INTERMEDIATE | MCAPISTR | Approved | IVRS - Inspection 0000* |
| 11/18/2002 | PLUMBING - GAS PRESSURE TEST | FMCCLURE | Approved | IVRS - Inspection 0000* |
| 11/18/2002 | ELECTRIC - FINAL | DSANTACR | Approved | SENT TO TEP ON 11/19/02 AT 9:15AM. OK TO CLEAR/OK CABLE DROP. |
| 11/18/2002 | ELECTRIC - CABLE DROP | DSANTACR | Approved | |
| 12/05/2002 | NPPO - FINAL | PGILBERT | Approved | Mitigation replacement for transplants, 2 cercidium flordium and chilopsis linearis (24 gallon in size). |
| 12/05/2002 | LANDSCAPE - FINAL | PGILBERT | Approved | OK FOR TEMP C OF O. Groundtreatment required for diturbed area adjacent to Pantano Wash (@ the Northeast corner of site). Add trees to interior border (2 Cercidium Floridum 15 gallon in size). Located @ the northeast border. |
| 12/05/2002 | ENGINEERING - FINAL | LMAKUS | Approved | |
| 12/05/2002 | FIRE - FINAL | JEGAN | Approved | IVRS - Inspection 0000*OKAY FOR C OF O. |
| 12/05/2002 | FIRE - HYDRANTS | LTHOMAS | Approved | |
| 12/05/2002 | BUILDING - FINAL | RSUBA | Approved | IVRS - Inspection 0000*PROVIDE ALL FINAL INSPECTIONS APPROVALS GOOD FOR CERT OF OCCUPANCY. |
| 12/06/2002 | PLUMBING - FINAL | ROHAVER | Approved | IVRS - Inspection 0000* |
| 12/06/2002 | PLUMBING - SEWER HCS CONNECT | ROHAVER | Approved | |
| 12/09/2002 | SIGN - FINAL | DJOHNSTO | Approved | CLEARED FOR TEMP C OF O UNTIL SIGN PERMITS OBTAINED. |
| 12/10/2002 | HEALTH DEPT - FINAL 724-7908 | RPAYTON | Approved | |
| 12/11/2002 | MECHANICAL - FINAL | JMILITEL | Approved | IVRS - Inspection 0000*OK FOR C OF O. |
| 03/17/2003 | PERMIT FINALED | RSUBA | Approved | |
| 03/17/2003 | BUILDING ABOVE CEILING | RSUBA | Approved | |
| 03/17/2003 | STEM WALL/RETAINING WALL | RSUBA | Approved |