Permit: T00CM00805
Permit Details
Apply Date:
02/18/2000
Applicant:
MONTANO DANIEL
Description:
SFR
Permit Reviews
Permit Number - T00CM00805
Permit Status: Final
Permit Description: SFR
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/20/2000 | REVISION - RESUBMITTAL | 01/30/2001 | COMPLETED |
Completed Inspections
Permit Status: Final
Permit Number: T00CM00805
Permit Description: SFR
Total Completed Inspections - 16
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/23/2000 | ELECTRIC - UFER | RFREIDIN | Approved | DENIED |
| 05/23/2000 | ELECTRIC - UFER | RFREIDIN | Approved | ADDTL COMMS - NEC 250-94 REQA A 1/0 GROUNDING ELECTRODS CONDUCTOR SEE NOTES BELOW TABLE |
| 07/25/2000 | EXCAVATION/LAYOUT REBAR & ZON | RFREIDIN | Approved | 1ST FLOOR WEST FTGS (PERIMETER) |
| 08/04/2000 | PLUMBING - ROUGH, SOIL | RFREIDIN | Approved | IVRS - Inspection 0000*/1ST FLOOR GROUND LEVEL |
| 08/11/2000 | BUILDING PRE-SLAB | RFREIDIN | Approved | IVRS - Inspection 0000*/MAIN FLR. WEST UPPER LEVEL |
| 11/16/2000 | ROOF NAILING | RFREIDIN | Approved | IVRS - Inspection 0000*/ROOF FRAMING ITEMS: 1. CONTINOUS BEARING V-TRUSSES, UPLIFT OR NAILING HARDWARE PER SHOP DRAWINGS 2. X-BRACING-PER SHOP DRAWINGS. 3. LATERAL BRACING PER SHOP DRAWINGS. 4. 3 PT. BEARING TRUSSES (SEE SHOP DRAWINGS HIGHLIGHTED). 5. PURLIN NAILING AND DESIGN FOR TRUSS TILE LOAD. 6. HEADER SIZES. 7. SUPPORT PLYWOOD EDGES, HIP SIDES TO VAULTED ROOF. 8. BRACE PONY WALLS FRONT AND BACK. 9. BEAM HARDWARE INTERIOR BEARING. 10. ALL GIRDER TO TRUSS HANGER SIZES. 11. SOME ROOF DECK AT EAVES NOT INSTALLED. 12. TURRET FRAMING AND DECK NOT COMPLETE. 13. P.A. STRAPS AT 1ST. FLOOR LEDGERS 14. DBL STUD GIRDER TRUSS BEARIN. 15. NOTE: INTERMEDIATE PLUMBING? |
| 01/17/2001 | MECHANICAL - INTERMEDIATE | BSTEVENS | Approved | IVRS - Inspection 0000* |
| 01/17/2001 | U VALUE FOR WINDOW | BSTEVENS | Approved | IVRS - Inspection 0000* |
| 03/06/2001 | STUCCO MESH | RFREIDIN | Approved | IVRS - Inspection 0000* |
| 03/20/2001 | FRAMING | RFREIDIN | Approved | IVRS - Inspection 0000* |
| 05/02/2001 | SHEET ROCK NAILING | RFREIDIN | Approved | IVRS - Inspection 0000*/ GARAGE FURN ROOM NEED RETUN PLATFORM 18" ABOVE LOWER GARAGE FF (NOT CURB STOP) NEED COMB/RELIEF DUCT HI/LOW CHECK SIZE OF H20 HEATER FLUE REQ 1/4 PITCH FOR FT |
| 09/05/2001 | MECHANICAL - FINAL | RFREIDIN | Approved | IVRS - Inspection 0000* |
| 09/05/2001 | PLUMBING - FINAL | RFREIDIN | Approved | IVRS - Inspection 0000* |
| 09/05/2001 | ELECTRIC - FINAL | RFREIDIN | Approved | IVRS - Inspection 0000* |
| 09/05/2001 | BUILDING - FINAL | RFREIDIN | Approved | IVRS - Inspection 0000*/ 1) INSTALL C.O. CAPS 2) NEED LOX AT ALL CONDUCTORS SERVICE EQUIPMENT 3) 30 AMP VACUMN CIRCUIT, USE GE TYPE BREAKER 4) NEED HANDRAIL AT REAR STAIR 5) NEED SINGLE OUTLET RECERT AT WATER SOFTNER 6) PLUG AT SOIL LINES (SEWER GAS) 7) OUTLET COMBUSTION AIR FOR FURNACE/ WATER HEATER GARAGE 8) GAS TAG GIVEN FOR CONSTRUCTION |
| 03/05/2002 | PERMIT FINALED | RFREIDIN | Approved |