Permit: DP22-0271
Permit Details
Apply Date:
09/28/2022
Applicant:
Jesus Cedeno
Description:
Grading - Parades Residence.
Permit Reviews
Permit Number - DP22-0271
Permit Status: Issued
Permit Description: Grading - Parades Residence.
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
09/28/2022 | DEV PKG - OK TO SUBMIT | 10/17/2022 | COMPLETED |
10/17/2022 | DEV PKG | 10/19/2022 | ACTIVE |
10/27/2022 | DEVELOPMENT PACKAGE REVIEW v.1 | 10/31/2022 | REQUIRES RESUBMIT |
11/04/2022 | DEVELOPMENT PACKAGE REVIEW v.2 | 11/08/2022 | REQUIRES RESUBMIT |
03/15/2023 | DEVELOPMENT PACKAGE REVIEW v.3 | 04/12/2023 | REQUIRES RESUBMIT |
04/17/2023 | DEVELOPMENT PACKAGE REVIEW v.4 | 04/26/2023 | APPROVED |
Outstanding Inspections
Permit Status: Issued
Permit Number: DP22-0271
Permite Description: Grading - Parades Residence.
Total Outstanding Inspections - 6
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/18/2023 | Final inspection to ensure all landscape and water harvesting SITE | N/A | Not Ready | Spoke to contact Senia Figueroa regarding construction debris and loose trash on site and she will address it next week, She stated she was having difficulties calling in inspections for the layout and pre~slab and I suggested that she goes to the permit desk downtown to see if they could assist her. |
08/18/2023 | SITE - Zoning Final | N/A | Not Ready | Work has started on the site and some of the installation of walls and retaining walls but that work is all under the building permit. The site work includes the installation of HDPE pipe underneath the driveway and the installation of the driveway. The contractor has been advised that this work will need a certified letter from the engineer of record since it was done and was not inspected by engineering. |
08/18/2023 | COT - FCON - Fire - Final | N/A | Not Applicable | |
08/18/2023 | SITE - Stormwater Final Inspection | N/A | Not Ready | Work has started on the site and some of the installation of walls and retaining walls but that work is all under the building permit. The site work includes the installation of HDPE pipe underneath the driveway and the installation of the driveway. The contractor has been advised that this work will need a certified letter from the engineer of record since it was done and was not inspected by engineering. |
08/18/2023 | COT - ENGR - Stormwater | N/A | Not Ready | Will review drainage areas with Dave Roberts at the beginning of next week. |
10/14/2024 | ENGR Engineering Final | N/A | Partial Pass | A homeowner is the contractor on this house needs to complete the back with some ground covering and in the front needs to place the riprap for the drainage |