Inspection History Details
Inspection Status: Not Ready
Inspection History: SITE - Zoning Final
Permit Number - DP22-0271
Inspection Description - SITE - Zoning Final
Inspection Status - Not Ready
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/18/2023 | SITE - Zoning Final | Not Ready | Work has started on the site and some of the installation of walls and retaining walls but that work is all under the building permit. The site work includes the installation of HDPE pipe underneath the driveway and the installation of the driveway. The contractor has been advised that this work will need a certified letter from the engineer of record since it was done and was not inspected by engineering. |