Status:
Complete
Type:
Development Package
Address:
3250 N STONE AV
Address NEW:
3250 N STONE AV
Apply Date:
09/23/2022
Applicant:
Jesus Florez
Description:
Grading - Stone/Navajo 2-plex.

Permit Reviews

Permit Number - DP22-0265
Permit Status: Complete
Permit Description: Grading - Stone/Navajo 2-plex.
Start Date Submittal Complete Date Status  
09/23/2022 DEV PKG - OK TO SUBMIT (GRADING ONLY) 09/30/2022 COMPLETED Review Details
10/14/2022 DEV PKG - OK TO SUBMIT 10/20/2022 ACTIVE Review Details
11/09/2022 DEVELOPMENT PACKAGE REVIEW v.2 01/04/2023 APPROVED Review Details
10/28/2022 DEVELOPMENT PACKAGE REVIEW v.1 11/02/2022 REQUIRES RESUBMIT Review Details

Conditions

Permit Number - DP22-0265
Permit Status: Complete
Permit Description: Grading - Stone/Navajo 2-plex.
Date Description Comments
01/03/2023 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit.

Outstanding Inspections

Permit Status: Complete
Permit Number: DP22-0265
Permite Description: Grading - Stone/Navajo 2-plex.
Total Outstanding Inspections - 3
Last Inspection Date Description Inspector Results Comments
02/24/2023 ENGR - Drainage Structures N/A Not Applicable building footing requires inspection under combination permit.
This project has no trash closure and no Stormwater catch basins requiring rebar inspection.
03/04/2024 COT - FCON - Fire - Final N/A Not Applicable
03/04/2024 Final inspection to ensure all landscape and water harvesting SITE N/A Partial Pass need plans

Completed Inspections

Permit Status: Complete
Permit Number: DP22-0265
Permit Description: Grading - Stone/Navajo 2-plex.
Total Completed Inspections - 9
Date Description Inspector Results Comments
07/13/2023 PDSD Site/Engineering Division - NPPO Passed Not applicable
01/17/2024 COT - SITE - Zoning Intermediate Passed
03/04/2024 ENGR Grading Final Passed
03/04/2024 SITE - Zoning Final Passed
03/04/2024 COT - ENGR - Stormwater Passed
03/05/2024 PDSD Site/Engineering Division - Landscaping Passed
03/05/2024 Final inspection to ensure all landscape and water harvesting SITE Passed
05/02/2024 SITE - Stormwater Final Inspection Passed
05/02/2024 ENGR Engineering Final Passed