Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Development Package
Address:
1620 N HALRON CT
Address NEW:
1620 N HALRON CT
Apply Date:
06/10/2022
Applicant:
Lisa Bowers
Description:
Revision 1 - Application date extended to Site/Grading - Clayton Warehouse.

Permit Reviews

Permit Number - DP22-0156
Permit Status: Complete
Permit Description: Revision 1 - Application date extended to Site/Grading - Clayton Warehouse.
Start Date Submittal Complete Date Status  
06/10/2022 DEV PKG - OK TO SUBMIT 06/22/2022 COMPLETED Review Details
06/22/2022 DEV PKG 08/23/2022 COMPLETED Review Details
02/19/2025 DEVELOPMENT PACKAGE NEW REVISION v.3 03/14/2025 APPROVED Review Details
01/23/2025 DEVELOPMENT PACKAGE NEW REVISION v.2 02/14/2025 REQUIRES RESUBMIT Review Details
11/28/2022 DEVELOPMENT PACKAGE REVIEW v.1 11/28/2022 REQUIRES RESUBMIT Review Details
12/14/2022 DEVELOPMENT PACKAGE REVIEW v.2 01/18/2023 APPROVED Review Details
11/26/2024 DEVELOPMENT PACKAGE NEW REVISION v.1 12/26/2024 REQUIRES RESUBMIT Review Details

Outstanding Inspections

Permit Status: Complete
Permit Number: DP22-0156
Permite Description: Revision 1 - Application date extended to Site/Grading - Clayton Warehouse.
Total Outstanding Inspections - 4
Last Inspection Date Description Inspector Results Comments
08/10/2023 SITE - Stormwater Final Inspection N/A Not Ready Clayton warehouse. Provide Stormwater controls as needed. Schedule for Stormwater follow up inspections throughout project.
09/27/2024 Final inspection to ensure all landscape and water harvesting SITE N/A Partial Pass I met with the property owner for this site and looked at the water harvesting, which appears to be done per the approved plans. It is partial past at this time.
The following areas have not been constructed per the approved plans and will need to be either revised in the drawings to be removed or will need to be constructed the approved plans.
1) a sidewalk lead from the cul-de-sac into the property, has not been constructed and needs to be completed as shown on the approved plans.
2) concrete noted at the east end of the building has not been installed as shown on the approve plans but replaced with asphalt revisions will need to be done or will need to be completed.
3) The handicap parking space and access is slightly modified in regards to location on the plans, but appears to be to meet slope and grade for those areas. Crosswalk coming into the building has an issue where it comes across a new concrete ramp for vehicles that is over 6%, which would require that the pedestrian pathway has handrails.
4) An additional rap has been provided on the north side of the property through an access gate that is not shown on the approved plans. The revised drawings need to include this area as an as built in the final revision stage.
5) the trash enclosure for this site has not been constructed per the approved plans currently they only have a slab on grade and four bollards no walls of any type and no gates. I have advised the owner that this has to be completed as shown on the approved plans or he has to provide revise drawings, that indicate it is being removed is being modified to a different type of structure that is not a CMU block wall.
01/31/2025 Consultation SITE N/A Complete (Recurring) Basin size and shape does not match plans. East side of building is asphalt, plans call for concrete. Scuppers missing on West sidewalk. Downspout discharge on corners differs from plans. ADA railing missing on sidewalk. Trash enclosure has no walls. Parking stops missing. South border of property has a K-rails retaining wall, not indicated on plans. Many plants missing. Drive ramps are not acceptable pedestrian access ramps.
09/11/2025 COT - FCON - Fire - Final N/A Not Applicable

Completed Inspections

Permit Status: Complete
Permit Number: DP22-0156
Permit Description: Revision 1 - Application date extended to Site/Grading - Clayton Warehouse.
Total Completed Inspections - 1
Date Description Inspector Results Comments
08/29/2025 ENGR Engineering Final Passed

Documents

File Name Document Type  
1_DRAINAGE STATEMENT_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
REV1_3_PLAN SET - CLAYTON WAREHOUSE - DP REV 1 - 2025-02-13_V3.PDF DOCUMENTS VIEW