Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: DP22-0145
Permit Details
Apply Date:
05/30/2022
Applicant:
Anthony Scelia
Description:
*Revision #1 (shade canopy/grade) started 8/17/24.* Site/Grading - New community building and three new residence buildings.
Permit Reviews
Permit Number - DP22-0145
Permit Status: Complete
Permit Description: *Revision #1 (shade canopy/grade) started 8/17/24.* Site/Grading - New community building and three new residence buildings.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/30/2022 | DEV PKG - OK TO SUBMIT | 06/15/2022 | COMPLETED |
| 06/15/2022 | DEV PKG | 08/26/2022 | COMPLETED |
| 08/17/2024 | DEVELOPMENT PACKAGE REVIEW v.1 | 09/11/2024 | APPROVED |
| 11/07/2022 | DEVELOPMENT PACKAGE REVIEW v.1 | 12/28/2022 | REQUIRES RESUBMIT |
| 01/09/2023 | DEVELOPMENT PACKAGE REVIEW v.2 | 02/28/2023 | APPROVED |
Outstanding Activity Conditions
Permit Number - DP22-0145
Permit Status: Complete
Permit Description: *Revision #1 (shade canopy/grade) started 8/17/24.* Site/Grading - New community building and three new residence buildings.
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 02/08/2023 | Approval from ES is required for APCs, please reach out to andy.vera@tucsonaz.gov |
Outstanding Inspections
Permit Status: Complete
Permit Number: DP22-0145
Permite Description: *Revision #1 (shade canopy/grade) started 8/17/24.* Site/Grading - New community building and three new residence buildings.
Total Outstanding Inspections - 4
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/02/2024 | SITE - Sign Footer/Setback/Excavation Layout/Rebar | N/A | Not Ready | Contractor will reschedule |
| 09/30/2024 | N/A | Not Ready | Contractor needs to grade for water harvesting area all around the building | |
| 10/11/2024 | For trash and recycling enclosures | N/A | Partial Pass | Looked at the Approach Slab and the curb and sidewalk for the Trash Enclosure approach access, all ready to be poured. I also pointed out a couple of areas when the sidewalk change of directions are non-compliant just south of the trash enclosure. The contractor Tofel Dent will remove and replace these sections. |
| 11/25/2024 | PDSD Site/Engineering Division - Landscaping | N/A | Partial Pass | Contractors got to remove the riprap and put felt underneath it. The down spots on the gutters, gotta be lowered and put splash pads underneath them. |
Completed Inspections
Permit Status: Complete
Permit Number: DP22-0145
Permit Description: *Revision #1 (shade canopy/grade) started 8/17/24.* Site/Grading - New community building and three new residence buildings.
Total Completed Inspections - 13
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/29/2023 | PDSD Engineering Division Pre-Construction SITE | Passed | -met with David Valencia PS, discussed stormwater controls, provided solid waste enclosure specs, requested track out cleanup on lee and Rook streets. | |
| 12/07/2023 | ENGR Grading Final | Passed | ||
| 12/28/2023 | COT - ENGR - Stormwater | Passed | ||
| 07/03/2024 | SITE - Sign Footer/Setback/Excavation Layout/Rebar | Passed | ||
| 11/22/2024 | For trash and recycling enclosures | Passed | ||
| 11/25/2024 | Passed | |||
| 11/25/2024 | Passed | |||
| 11/25/2024 | ENGR - Drainage Structures | Passed | ||
| 11/25/2024 | PDSD Site/Engineering Division - NPPO | Passed | ||
| 11/25/2024 | Final inspection to ensure all landscape and water harvesting SITE | Passed | ||
| 12/06/2024 | PDSD Site/Engineering Division - Landscaping | Passed | ||
| 12/09/2024 | SITE - Zoning Final | Passed | ||
| 01/17/2025 | ENGR Engineering Final | Passed |