Inspection History Details
Inspection Status: Not Ready
Inspection History: For trash and recycling enclosures
Permit Number - DP22-0145
Inspection Description - For trash and recycling enclosures
Inspection Status - Not Ready
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/02/2024 | For trash and recycling enclosures | Not Ready | Contractor will reschedule | |
07/03/2024 | For trash and recycling enclosures | Passed | installing the steel in the footer for trash enclosure | |
07/12/2024 | For trash and recycling enclosures | Not Ready | I looked at the Trash Enclosure for the contractor They are not ready at this time, they are constructing the walls up to 6 foot high before the grout. I have explained to the contractor what is expected when we come back to look at the wall after they have grouted. They will be providing openings in the wall for every cell that has rebar in it for the witness holes for us to verify that the grout has been placed correctly. I have also advised him of the proper locations for the bollards to be installed at a later date, which will require that they chipped up part of the footer, since I have not provided blackouts during their original footer pour. I met with a supervisor from TOEFL debt and advise them of my conversations with the contractor. I reminded him to make sure that the inside of the trash enclosure is free and clear for 10’ x 10’ then all the bollards are incorrect location and they’re at the gates. We have enough room to allow for a 12 foot of free and clear space for the trash trucks. |
|
07/18/2024 | For trash and recycling enclosures | Passed | ||
09/30/2024 | For trash and recycling enclosures | Partial Pass | Contractor graded the floor for the trash enclosure it’s good to set the rebar number four bars at 1 foot center | |
10/02/2024 | For trash and recycling enclosures | Partial Pass | trash enclosure is good to be grouted up to to the top. Contractor needs to knock out weep holes at the bottom of the trash enclosure walls so the grout can come out.Goog for t.c of o | |
10/11/2024 | For trash and recycling enclosures | Partial Pass | Looked at the Approach Slab and the curb and sidewalk for the Trash Enclosure approach access, all ready to be poured. I also pointed out a couple of areas when the sidewalk change of directions are non-compliant just south of the trash enclosure. The contractor Tofel Dent will remove and replace these sections. | |
10/22/2024 | For trash and recycling enclosures | Partial Pass | Contractor still needs to finish the gates for the trash enclosure in the front and in the sidewalk entrance |