Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Issued
Type:
Development Package
Apply Date:
04/25/2022
Applicant:
Description:
Site/Grading - Floor and Decor. Tenant improvement of existing retail building.

Permit Reviews

Permit Number - DP22-0111
Permit Status: Issued
Permit Description: Site/Grading - Floor and Decor. Tenant improvement of existing retail building.
Start Date Submittal Complete Date Status  
04/25/2022 DEV PKG - OK TO SUBMIT 05/11/2022 COMPLETED Review Details
06/06/2022 DEV PKG - OK TO SUBMIT 06/07/2022 COMPLETED Review Details
06/07/2022 DEV PKG 08/22/2022 COMPLETED Review Details
09/14/2022 DEV PKG - RESUBMITTAL 09/30/2022 COMPLETED Review Details
08/22/2023 AS-BUILT v.1 08/24/2023 APPROVED Review Details

Outstanding Inspections

Permit Status: Issued
Permit Number: DP22-0111
Permite Description: Site/Grading - Floor and Decor. Tenant improvement of existing retail building.
Total Outstanding Inspections - 3
Last Inspection Date Description Inspector Results Comments
09/08/2023 SPECIAL INSPECTION - Grading N/A Partial Pass Ok for a Level 4 TCO pending all other required Inspection Approvals
This site will not be fully Approved until all work is completed as shown on the Approved Plans
08/30/2023 ENGR Engineering Final N/A Not Ready
08/21/2023 ENGR Grading Final N/A Partial Pass Looked at the AC Asphalt that was modified near the front entrance of the store. The Bollards have not been installed as requested previously but will be installed and Inspected prior to the final Approval for Occupancy.

Completed Inspections

Permit Status: Issued
Permit Number: DP22-0111
Permit Description: Site/Grading - Floor and Decor. Tenant improvement of existing retail building.
Total Completed Inspections - 29
Date Description Inspector Results Comments
09/08/2023 SPECIAL INSPECTION - Sign Electrical (Third Party) Passed
09/08/2023 SPEC - Site Preparation (Third Party) Passed Ok for a Level 4 TCO pending all other required Inspection Approvals
This site will not be fully Approved until all work is completed as shown on the Approved Plans
09/08/2023 SPECIAL INSPECTION - Sign Field Welding (Third Party) Passed
09/08/2023 SPECIAL INSPECTION - Sign Bolting (Third Party) Passed
09/08/2023 SPECIAL INSPECTION - Sign Footing (Third Party) Passed
09/08/2023 SPECIAL INSPECTION - OTHER (Third Party) Passed
09/19/2023 PDSD Site/Engineering Division - Landscaping Passed
09/19/2023 COT - SITE - Zoning Intermediate Passed
09/19/2023 ENGR - Drainage Structures Passed
09/19/2023 Final inspection to ensure all landscape and water harvesting SITE Passed
09/19/2023 SITE - SWPPP Correction Notice Passed
09/19/2023 SITE - Zoning Final Passed
09/19/2023 SITE - Zoning Violation Passed
09/19/2023 SITE Passed
09/19/2023 PDSD Site/Engineering Division - NPPO Passed
09/19/2023 ENGR Engineering Final Passed
09/19/2023 Verify required native plant protection, relocation, removal is completed prior to activity on job site Passed
09/19/2023 NPPO Pre-Construction Passed
09/19/2023 SITE - Stormwater Follow-up Passed
09/20/2023 ENGR Grading Final Passed
09/19/2023 SITE - SWPPP Violation Notice Passed
09/19/2023 SITE - Zoning Compliance Passed
09/19/2023 SITE - Stormwater Final Inspection Passed
09/19/2023 COT - ENGR - Site - Assurance Release Passed
09/19/2023 SITE - Stormwater Setup and Controls Passed
09/19/2023 City of Tucson (COT) Planning and Development Services Engineering (ENGR) Zoning Compliance Inspection Passed
09/19/2023 PDSD Engineering Division Pre-Construction SITE Passed
09/19/2023 COT - ENGR - Stormwater Passed
09/19/2023 COT - ENGR - Signage Final Passed

Documents

File Name Document Type  
APPROVED CD220119-C2.11 B1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
APPROVED BY PDSD - 2 - PLAN SET - DP22-0111_V1_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
2 - COMMENT RESPONSE LETTER - DP22-0111.PDF PLANS UNDER REVIEW VIEW
2 - PLAN SET - DP22-0111.PDF PLANS UNDER REVIEW VIEW
2_ONLINE SUBMITTAL PAGE, RECVD 09.09.22.PDF PLANS UNDER REVIEW VIEW
1_F&D TUCSON - CIVIL SET.PDF PLANS UNDER REVIEW VIEW
1_F&D TUCSON - DRAINAGE MEMO.PDF PLANS UNDER REVIEW VIEW
1_F&D TUCSON - EXTERIOR ELEVATIONS.PDF PLANS UNDER REVIEW VIEW
1_ONLINE SUBMITTAL PAGE, RECVD 05.26.22.PDF PLANS UNDER REVIEW VIEW
1_F&D TUCSON - LANDSCAPE SET.PDF PLANS UNDER REVIEW VIEW
1_TUCSON WATER PLAN REVIEW RESPONSE, EMAIL 05.23.22.PDF PLANS UNDER REVIEW VIEW
1_ONLINE SUBMITTAL APPLICATION, RECVD 04.18.22.PDF PLANS UNDER REVIEW VIEW
1_FD TUCSON SP APPLICATION, DEV PKG.PDF PLANS UNDER REVIEW VIEW