Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR Grading Final
Permit Number - DP22-0111
Inspection Description - ENGR Grading Final
Inspection Status - Not Ready
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/27/2022 | ENGR Grading Final | Not Ready | ||
10/27/2022 | ENGR Grading Final | Not Ready | ||
10/27/2022 | ENGR Grading Final | Not Ready | ||
10/27/2022 | ENGR Grading Final | Not Ready | ||
05/17/2023 | ENGR Grading Final | Complete (Recurring) | Utility work in progress | |
08/07/2023 | ENGR Grading Final | Not Ready | pending exterior striping and exterior activities | |
08/07/2023 | ENGR Grading Final | Not Ready | pending exterior striping and other activities | |
08/07/2023 | ENGR Grading Final | Not Ready | pending exterior striping and other exterior activities | |
08/07/2023 | ENGR Grading Final | Not Ready | pending striping and exterior work | |
08/15/2023 | ENGR Grading Final | Not Ready | Complete all work as shown on the approved plans, crews worked on completing the minor grading of the AC at the Main Entrance. Bollards still need to be installed as previously discussed at both Entrances to protect the Pedestrian traffic in that area, this is a Code requirement per Section 7 of the City of Tucson Technical Standards. | |
08/21/2023 | ENGR Grading Final | Not Ready | Looked at the AC Asphalt that was modified near the front entrance of the store. The Bollards have not been installed as requested previously but will be installed and Inspected prior to the final Approval for Occupancy. | |
08/21/2023 | ENGR Grading Final | Partial Pass | Looked at the AC Asphalt that was modified near the front entrance of the store. The Bollards have not been installed as requested previously but will be installed and Inspected prior to the final Approval for Occupancy. | |
08/21/2023 | ENGR Grading Final | Partial Pass | Looked at the AC Asphalt that was modified near the front entrance of the store. The Bollards have not been installed as requested previously but will be installed and Inspected prior to the final Approval for Occupancy. | |
08/21/2023 | ENGR Grading Final | Partial Pass | Looked at the AC Asphalt that was modified near the front entrance of the store. The Bollards have not been installed as requested previously but will be installed and Inspected prior to the final Approval for Occupancy. | |
08/30/2023 | ENGR Grading Final | Passed | ||
08/30/2023 | ENGR Grading Final | Passed | ||
08/30/2023 | ENGR Grading Final | Passed | ||
08/30/2023 | ENGR Grading Final | Passed | ||
09/20/2023 | ENGR Grading Final | Passed |