Permit: DP22-0080
Permit Details
Apply Date:
04/04/2022
Applicant:
Kyle Shepherd
Description:
Grading - La Estancia, Parcel 7, Lots 1 thru 107, and Common Areas A7, B7, C7, and D7.
Permit Reviews
Permit Number - DP22-0080
Permit Status: Issued
Permit Description: Grading - La Estancia, Parcel 7, Lots 1 thru 107, and Common Areas A7, B7, C7, and D7.
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
04/04/2022 | DEV PKG - OK TO SUBMIT (GRADING ONLY) | 04/13/2022 | COMPLETED |
04/13/2022 | GRADING | 06/16/2022 | COMPLETED |
09/29/2022 | GRADING | 10/13/2022 | ACTIVE |
10/28/2022 | DEVELOPMENT PACKAGE REVIEW v.1 | 12/06/2022 | APPROVED |
Outstanding Activity Conditions
Permit Number - DP22-0080
Permit Status: Issued
Permit Description: Grading - La Estancia, Parcel 7, Lots 1 thru 107, and Common Areas A7, B7, C7, and D7.
Total Outstanding Activity Conditions - 2
Date | Name |
---|---|
08/07/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. |
08/07/2023 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
Outstanding Inspections
Permit Status: Issued
Permit Number: DP22-0080
Permite Description: Grading - La Estancia, Parcel 7, Lots 1 thru 107, and Common Areas A7, B7, C7, and D7.
Total Outstanding Inspections - 2
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/29/2023 | SITE - Stormwater Final Inspection | N/A | Not Ready | Complete all of the work on this site as shown on the Approved Drawings, provide Approved Drawings or Approved Revised Drawings for the Inspector to use during all Final Inspections. Once the Site has been Approved with Drawings you can then seek Final Approval and Closure for all open Permits as needed. Prior to the Final Approval of this site you will need to provide the following Document/s before we can sign the project as finished and complete. Ensure that All Drawings represent the Site as it is, and that All Revision changes have been Submitted and Approved by the City of Tucson Review staff, no As-built Drawings will be accepted. Also provide a copy of the Notice Of Termination from the Arizona Department of Environmental Quality for the closing of the SWPPP for this Permit. Possible signed and Sealed Certification Letter from the Engineer of Record stating that the site was constructed per the Approved Drawings. |
12/22/2023 | Final inspection to ensure all landscape and water harvesting SITE | N/A | Complete (Recurring) | Minor cleanup of the sites under construction at this time, general clean of the streets and the basins will be required before the final approval once all work has been completed per the Approved plans. |