Permit: DP22-0027
Permit Details
Apply Date:
02/16/2022
Applicant:
Blake Junak
Description:
Tentative Plat - SFR at The Bridges B-1. Lots 1 thru 126, and Common Areas "A" (private streets, uti
Permit Reviews
Permit Number - DP22-0027
Permit Status: Issued
Permit Description: Tentative Plat - SFR at The Bridges B-1. Lots 1 thru 126, and Common Areas "A" (private streets, uti
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
02/16/2022 | DEV PKG - OK TO SUBMIT | 02/18/2022 | COMPLETED |
02/18/2022 | TENTATIVE PLAT REVIEW | 06/02/2022 | COMPLETED |
10/25/2024 | DEVELOPMENT PACKAGE NEW REVISION v.1 | 11/27/2024 | APPROVED |
11/09/2022 | DEVELOPMENT PACKAGE REVIEW v.1 | 11/30/2022 | REQUIRES RESUBMIT |
03/06/2023 | DEVELOPMENT PACKAGE REVIEW v.2 | 03/30/2023 | APPROVED |
09/20/2024 | DEVELOPMENT PACKAGE REVIEW v.1 | 09/30/2024 | REQUIRES RESUBMIT |
Outstanding Inspections
Permit Status: Issued
Permit Number: DP22-0027
Permite Description: Tentative Plat - SFR at The Bridges B-1. Lots 1 thru 126, and Common Areas "A" (private streets, uti
Total Outstanding Inspections - 6
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
02/28/2024 | SITE - Stormwater Setup and Controls | N/A | Complete (Recurring) | All setups and controls are in place with no concerns at this time. |
06/18/2024 | N/A | Partial Pass | ||
07/17/2024 | ENGR - Drainage Structures | N/A | Partial Pass | Last drainage structure on this street, looks good and ready for poor. 3 catch basins were also looked at and they are the 307 standard modified. Rick Engineering will be sending in the revised drawings. |
06/20/2024 | SITE - Stormwater Follow-up | N/A | Partial Pass | |
10/01/2024 | N/A | Canceled | ||
10/01/2024 | N/A | Canceled |
Completed Inspections
Permit Status: Issued
Permit Number: DP22-0027
Permit Description: Tentative Plat - SFR at The Bridges B-1. Lots 1 thru 126, and Common Areas "A" (private streets, uti
Total Completed Inspections - 5
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/29/2024 | PDSD Engineering Division Pre-Construction SITE | Passed | ||
08/19/2024 | SITE - Stormwater Follow-up | Passed | ||
09/11/2024 | COT - ENGR - Stormwater | Passed | ||
10/01/2024 | Passed | |||
10/01/2024 | Grading Progress ENGR | Passed | Lots are ready for buildout of new homes |