Inspection History Details
Inspection Status: Complete (Recurring)
Inspection History: SITE - Stormwater Follow-up
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/14/2024 | SITE - Stormwater Follow-up | Complete (Recurring) | Walked site with Dan Murtausch and all set up and controls are in place and no concerns at this time. Dan said there is a sewer pre-construction meeting that is to be scheduled for next week. |
|
| 03/13/2024 | SITE - Stormwater Follow-up | Complete (Recurring) | All setup and controls are in place with no concerns at this time. | |
| 03/27/2024 | SITE - Stormwater Follow-up | Complete (Recurring) | All setup and controls are in place, some areas of North front adjacent to walking path along 36th st need to have wattle adjusted, I have left message with Mike Gerber at Borderland to address the area. | |
| 04/10/2024 | SITE - Stormwater Follow-up | Complete (Recurring) | Entire perimeter of site walked and all setup and controls are in place with no concerns at this time. | |
| 04/24/2024 | SITE - Stormwater Follow-up | Partial Pass | ||
| 05/08/2024 | SITE - Stormwater Follow-up | Complete (Recurring) | Stormwater controls look good, piping to start going in about a month from now. | |
| 05/20/2024 | SITE - Stormwater Follow-up | Complete (Recurring) | ||
| 06/05/2024 | SITE - Stormwater Follow-up | Complete (Recurring) | Passed | |
| 06/20/2024 | SITE - Stormwater Follow-up | Partial Pass | ||
| 07/02/2024 | SITE - Stormwater Follow-up | Canceled | ||
| 07/17/2024 | SITE - Stormwater Follow-up | Complete (Recurring) | ||
| 07/31/2024 | SITE - Stormwater Follow-up | Complete (Recurring) | ||
| 08/06/2024 | SITE - Stormwater Follow-up | Complete (Recurring) | Maintenance needed on wattle along 36th Ave | |
| 08/19/2024 | SITE - Stormwater Follow-up | Passed |