Permit Details

Status:
Fees Paid
Type:
Development Package
Apply Date:
01/27/2022
Applicant:
Description:
*Revision #3 (parking) started 5/2/24*Revision 2 - Sanitary Sewer Services and Storm Drainage Connection // Site/Grading - CAP Bridges, indoor storage facility.

Permit Reviews

Permit Number - DP22-0010
Permit Status: Fees paid
Permit Description: *Revision #3 (parking) started 5/2/24*Revision 2 - Sanitary Sewer Services and Storm Drainage Connection // Site/Grading - CAP Bridges, indoor storage facility.
Start Date Submittal Complete Date Status  
01/27/2022 DEV PKG - OK TO SUBMIT 02/07/2022 COMPLETED Review Details
02/07/2022 DEV PKG 04/19/2022 COMPLETED Review Details
06/23/2022 DEV PKG - RESUBMITTAL 08/15/2022 COMPLETED Review Details
06/09/2023 DEVELOPMENT PACKAGE REVIEW v.1 06/20/2023 REQUIRES RESUBMIT Review Details
12/14/2022 DEVELOPMENT PACKAGE REVIEW v.1 01/13/2023 APPROVED Review Details
07/12/2023 DEVELOPMENT PACKAGE REVIEW v.2 08/09/2023 REQUIRES RESUBMIT Review Details
12/13/2023 DEVELOPMENT PACKAGE NEW v.1 01/12/2024 REQUIRES RESUBMIT Review Details
08/28/2023 DEVELOPMENT PACKAGE REVIEW v.3 10/06/2023 APPROVED Review Details
03/28/2024 DEVELOPMENT PACKAGE NEW v.2 04/01/2024 APPROVED Review Details
05/02/2024 DEVELOPMENT PACKAGE NEW v.1 05/20/2024 REQUIRES RESUBMIT Review Details

Outstanding Inspections

Permit Status: Fees Paid
Permit Number: DP22-0010
Permite Description: *Revision #3 (parking) started 5/2/24*Revision 2 - Sanitary Sewer Services and Storm Drainage Connection // Site/Grading - CAP Bridges, indoor storage facility.
Total Outstanding Inspections - 3
Last Inspection Date Description Inspector Results Comments
02/22/2024 PDSD Site/Engineering Division - NPPO N/A Not Applicable
04/16/2024 SITE - Stormwater Follow-up N/A Complete (Recurring) Dan Bishop would be FL contacted me to look at this site to verify that they are wanting to change the grades in the basin located on the west end of the project slightly since their concrete box structure is not at the correct grade and came in lower than expected. They will be submitting revised drawings to get approved showing the changes that will be made to the site.
07/03/2024 COT - ENGR - Stormwater N/A Complete (Recurring) Met with the Eagle Rock SWPPP inspector and we have spoken about a plan to bring the site into conforming with the requirements.

Completed Inspections

Permit Status: Fees Paid
Permit Number: DP22-0010
Permit Description: *Revision #3 (parking) started 5/2/24*Revision 2 - Sanitary Sewer Services and Storm Drainage Connection // Site/Grading - CAP Bridges, indoor storage facility.
Total Completed Inspections - 5
Date Description Inspector Results Comments
01/30/2024 PDSD Engineering Division Pre-Construction SITE Passed
02/22/2024 SITE - Zoning Compliance Passed
02/22/2024 COT - SITE - Zoning Intermediate Passed
02/22/2024 SITE - SWPPP Violation Notice Passed
02/22/2024 SITE - SWPPP Correction Notice Passed

Documents

File Name Document Type  
APPROVED_CAP BRIDGES CIVILSET D 09202022 DIGSIG_V1.PDF DOCUMENTS VIEW
APPROVED_REV1_2 PLAN SET_V3.PDF DOCUMENTS VIEW
DEQ_FUGITIVEDUSTPERMIT_20230111_095706_V1.PDF DOCUMENTS VIEW
APPROVED REV2_REV PLAN SET_V01_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CAP BRIDGES CIVILSET D 09202022 DIGSIG_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
2_DRC APPROVAL.EXTRASPACE.PDF PLANS UNDER REVIEW VIEW
1_GEOTECH.PDF PLANS UNDER REVIEW VIEW
1_HYDROLOGY REPORT.PDF PLANS UNDER REVIEW VIEW