Permit: DP22-0010
Permit Details
Apply Date:
01/27/2022
Applicant:
Description:
*Revision #3 (parking) started 5/2/24*Revision 2 - Sanitary Sewer Services and Storm Drainage Connection // Site/Grading - CAP Bridges, indoor storage facility.
Permit Reviews
Permit Number - DP22-0010
Permit Status: Fees paid
Permit Description: *Revision #3 (parking) started 5/2/24*Revision 2 - Sanitary Sewer Services and Storm Drainage Connection // Site/Grading - CAP Bridges, indoor storage facility.
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
01/27/2022 | DEV PKG - OK TO SUBMIT | 02/07/2022 | COMPLETED |
02/07/2022 | DEV PKG | 04/19/2022 | COMPLETED |
06/23/2022 | DEV PKG - RESUBMITTAL | 08/15/2022 | COMPLETED |
06/09/2023 | DEVELOPMENT PACKAGE REVIEW v.1 | 06/20/2023 | REQUIRES RESUBMIT |
12/14/2022 | DEVELOPMENT PACKAGE REVIEW v.1 | 01/13/2023 | APPROVED |
07/12/2023 | DEVELOPMENT PACKAGE REVIEW v.2 | 08/09/2023 | REQUIRES RESUBMIT |
12/13/2023 | DEVELOPMENT PACKAGE NEW v.1 | 01/12/2024 | REQUIRES RESUBMIT |
08/28/2023 | DEVELOPMENT PACKAGE REVIEW v.3 | 10/06/2023 | APPROVED |
03/28/2024 | DEVELOPMENT PACKAGE NEW v.2 | 04/01/2024 | APPROVED |
05/02/2024 | DEVELOPMENT PACKAGE NEW v.1 | 05/20/2024 | REQUIRES RESUBMIT |
Outstanding Inspections
Permit Status: Fees Paid
Permit Number: DP22-0010
Permite Description: *Revision #3 (parking) started 5/2/24*Revision 2 - Sanitary Sewer Services and Storm Drainage Connection // Site/Grading - CAP Bridges, indoor storage facility.
Total Outstanding Inspections - 3
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
02/22/2024 | PDSD Site/Engineering Division - NPPO | N/A | Not Applicable | |
04/16/2024 | SITE - Stormwater Follow-up | N/A | Complete (Recurring) | Dan Bishop would be FL contacted me to look at this site to verify that they are wanting to change the grades in the basin located on the west end of the project slightly since their concrete box structure is not at the correct grade and came in lower than expected. They will be submitting revised drawings to get approved showing the changes that will be made to the site. |
07/03/2024 | COT - ENGR - Stormwater | N/A | Complete (Recurring) | Met with the Eagle Rock SWPPP inspector and we have spoken about a plan to bring the site into conforming with the requirements. |
Completed Inspections
Permit Status: Fees Paid
Permit Number: DP22-0010
Permit Description: *Revision #3 (parking) started 5/2/24*Revision 2 - Sanitary Sewer Services and Storm Drainage Connection // Site/Grading - CAP Bridges, indoor storage facility.
Total Completed Inspections - 5
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/30/2024 | PDSD Engineering Division Pre-Construction SITE | Passed | ||
02/22/2024 | SITE - Zoning Compliance | Passed | ||
02/22/2024 | COT - SITE - Zoning Intermediate | Passed | ||
02/22/2024 | SITE - SWPPP Violation Notice | Passed | ||
02/22/2024 | SITE - SWPPP Correction Notice | Passed |