Inspection Status: Complete (Recurring)
Inspection History: COT - ENGR - Stormwater
| Date |
Description |
Inspector |
Results |
Comments |
| 07/03/2024 |
COT - ENGR - Stormwater |
|
Complete (Recurring) |
Met with the Eagle Rock SWPPP inspector and we have spoken about a plan to bring the site into conforming with the requirements. |
| 08/06/2024 |
COT - ENGR - Stormwater |
|
Complete (Recurring) |
BMPs have been installed as per plan and site looks good. |
| 09/09/2024 |
COT - ENGR - Stormwater |
|
Complete (Recurring) |
Everything looks good no concerns at this time |
| 09/11/2024 |
COT - ENGR - Stormwater |
|
Partial Pass |
Contractors installing 30 inch RCP’s on the west side of the building 120 feet ready to be backfilled |
| 09/16/2024 |
COT - ENGR - Stormwater |
|
Partial Pass |
Storm pipe passed, partial backfill approved |
| 09/18/2024 |
COT - ENGR - Stormwater |
|
Complete (Recurring) |
Storm pipe passed, partial backfill approved, 9/16/24. 2nd section on the east side good to backfill 9/18/24 |
| 10/11/2024 |
COT - ENGR - Stormwater |
|
Partial Pass |
|