Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Approved
Type:
Development Package
Apply Date:
11/16/2021
Applicant:
Justin Smith
Description:
Grading - Saguaro Trails, Block 3, Lots 1 thru 38.

Permit Reviews

Permit Number - DP21-0307
Permit Status: Approved
Permit Description: Grading - Saguaro Trails, Block 3, Lots 1 thru 38.
Start Date Submittal Complete Date Status  
11/16/2021 DEV PKG - OK TO SUBMIT (GRADING ONLY) 11/26/2021 COMPLETED Review Details
11/26/2021 GRADING 11/26/2021 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - DP21-0307
Permit Status: Approved
Permit Description: Grading - Saguaro Trails, Block 3, Lots 1 thru 38.
Total Outstanding Activity Conditions - 2
Date Name
07/20/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
07/20/2023 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.

Outstanding Inspections

Permit Status: Approved
Permit Number: DP21-0307
Permite Description: Grading - Saguaro Trails, Block 3, Lots 1 thru 38.
Total Outstanding Inspections - 8
Last Inspection Date Description Inspector Results Comments
10/27/2022 ENGR Engineering Final N/A Not Ready
10/26/2022 SITE - Stormwater Final Inspection N/A Not Ready
10/26/2022 SITE - SWPPP Correction Notice N/A Not Ready
10/26/2022 PDSD Site/Engineering Division - NPPO N/A Not Ready
10/26/2022 SITE - Stormwater Follow-up N/A Not Ready
10/26/2022 SITE - SWPPP Violation Notice N/A Not Ready
11/16/2023 SITE - Stormwater Setup and Controls N/A Complete (Recurring) No concerns at this time
10/27/2022 COT - ENGR - Signage Final N/A Not Ready

Completed Inspections

Permit Status: Approved
Permit Number: DP21-0307
Permit Description: Grading - Saguaro Trails, Block 3, Lots 1 thru 38.
Total Completed Inspections - 8
Date Description Inspector Results Comments
04/07/2023 PDSD Engineering Division Pre-Construction SITE Passed
11/16/2023 PDSD Site/Engineering Division - Landscaping Passed
11/16/2023 SITE - SWPPP Correction Notice Passed
11/16/2023 PDSD Site/Engineering Division - NPPO Passed
11/16/2023 SITE - Stormwater Follow-up Passed
11/16/2023 ENGR Grading Final Passed
11/16/2023 SITE - SWPPP Violation Notice Passed
11/16/2023 COT - ENGR - Signage Final Passed

Documents

File Name Document Type  
1_ONLINE SUBMITTAL APPLICATION, RECVD 11.10.21.PDF PLANS UNDER REVIEW VIEW
1_BLOCK 3 PAVING 2021-11-08.PDF PLANS UNDER REVIEW VIEW