Inspection History Details
Inspection Status: Not Ready
Inspection History: SITE - Stormwater Setup and Controls
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/26/2022 | SITE - Stormwater Setup and Controls | Not Ready | ||
| 04/07/2023 | SITE - Stormwater Setup and Controls | Partial Pass | INITIAL CONTROLS ARE IN PLACE AT THIS TIME ANS D WILL BE CHECKED THROUGH THE DURATION OF THE PROJECT. |
|
| 11/16/2023 | SITE - Stormwater Setup and Controls | Complete (Recurring) | No concerns at this time |