Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Development Package
Address NEW:
1215 E WAREHOUSE AV
Apply Date:
11/16/2021
Applicant:
Description:
Site/Grading/Floodplain - Perception Counseling.

Permit Reviews

Permit Number - DP21-0306
Permit Status: Complete
Permit Description: Site/Grading/Floodplain - Perception Counseling.
Start Date Submittal Complete Date Status  
03/08/2022 DEV PKG - RESUBMITTAL 06/10/2022 COMPLETED Review Details
11/16/2021 DEV PKG - OK TO SUBMIT 11/26/2021 COMPLETED Review Details
12/17/2021 DEV PKG - OK TO SUBMIT 12/24/2021 COMPLETED Review Details
12/24/2021 DEV PKG 02/14/2022 COMPLETED Review Details

Outstanding Inspections

Permit Status: Complete
Permit Number: DP21-0306
Permite Description: Site/Grading/Floodplain - Perception Counseling.
Total Outstanding Inspections - 3
Last Inspection Date Description Inspector Results Comments
09/11/2023 ENGR Grading Final N/A Not Ready Contractor working on the Grading of the Parking Lot
09/29/2023 COT - ENGR - Signage Final N/A Not Ready
10/05/2023 ENGR Engineering Final N/A Partial Pass All items completed except 1 tree located at center East end of parking lot and 2 roof drain areas in front of scuppers need to have landscape rock cleared from opening will recall when completed.

Completed Inspections

Permit Status: Complete
Permit Number: DP21-0306
Permit Description: Site/Grading/Floodplain - Perception Counseling.
Total Completed Inspections - 11
Date Description Inspector Results Comments
07/21/2023 PDSD Engineering Division Pre-Construction SITE Passed
09/11/2023 SITE - SWPPP Correction Notice Passed
09/11/2023 PDSD Site/Engineering Division - NPPO Passed
09/11/2023 SITE - SWPPP Violation Notice Passed
09/27/2023 SITE - Stormwater Setup and Controls Passed
09/27/2023 SITE - Stormwater Follow-up Passed
09/27/2023 ENGR Grading Final Passed
09/29/2023 SITE - Stormwater Final Inspection Passed
09/29/2023 PDSD Site/Engineering Division - Landscaping Passed
10/05/2023 COT - ENGR - Signage Final Passed Address is posted on SE corner of building.
10/06/2023 ENGR Engineering Final Passed All partial pass items completed.

Documents

File Name Document Type  
APPROVED DEVELOPMENT PACKAGE.PDF DEVELOPMENT PACKAGE VIEW
CONTRACTORS LETTER OF INTENT.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
COMMENT RESPONSE LETTER.PDF DOCUMENTS VIEW
DRAINAGE REPORT.PDF DOCUMENTS VIEW
ONLINE SUBMITTAL PAGE, RECVD 03.07.22.PDF DOCUMENTS VIEW
SOILS REPORT, GEOTECHNICAL ENGINEERING.PDF DOCUMENTS VIEW
ONLINE SUBMITTAL PAGE, RECVD 12.14.21.PDF DOCUMENTS VIEW
ONLINE SUBMITTAL APPLICATION, RECVD 11.10.21.PDF DOCUMENTS VIEW