Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
| Date |
Description |
Inspector |
Results |
Comments |
| 10/27/2022 |
ENGR Engineering Final
|
|
Not Ready |
|
| 10/27/2022 |
ENGR Engineering Final
|
|
Not Ready |
|
| 09/27/2023 |
ENGR Engineering Final
|
|
Partial Pass |
TC of O level 4 Gates to be installed at front entry locations and stripping for crosswalk from Aztec headed East needs one stripe added. |
| 09/27/2023 |
ENGR Engineering Final
|
|
Partial Pass |
TC of O level 4 gates to be installed at the front entry locations and stripping at crosswalk from Aztec headed East needs a missing stripe painted. |
| 09/29/2023 |
ENGR Engineering Final
|
|
Partial Pass |
Firebox for electric gate to be installed next week and (2) trees to be replaced next week prior to recall of inspection. TC of O level 4 |
| 09/29/2023 |
ENGR Engineering Final
|
|
Partial Pass |
Firebox for electric gate to be installed next week, and will recall after install. TC of O level 4 |
| 10/05/2023 |
ENGR Engineering Final
|
|
Partial Pass |
All items completed except 1 tree located at center East end of parking lot and 2 roof drain areas in front of scuppers need to have landscape rock cleared from opening will recall when completed. |
| 10/05/2023 |
ENGR Engineering Final
|
|
Partial Pass |
All items completed except 1 tree located at center East end of parking lot and 2 roof drain areas in front of scuppers need to have landscape rock cleared from opening will recall when completed. |
| 10/06/2023 |
ENGR Engineering Final
|
|
Passed |
All partial pass items completed. |
| 10/06/2023 |
ENGR Engineering Final
|
|
Passed |
All partial pass items completed. |