Status:
Issued
Type:
Development Package
Apply Date:
09/24/2021
Applicant:
Andie Hemmah
Description:
*Revision 2 (splash pad) started 6/12/2024* Tentative Plat - La Estancia, Parcels 6 thru 8. Parcel 6: Lots 1 thru 107, and Common Areas "A6" thr

Permit Reviews

Permit Number - DP21-0259
Permit Status: Issued
Permit Description: *Revision 2 (splash pad) started 6/12/2024* Tentative Plat - La Estancia, Parcels 6 thru 8. Parcel 6: Lots 1 thru 107, and Common Areas "A6" thr
Start Date Submittal Complete Date Status  
01/19/2022 TENTATIVE PLAT REVIEW 03/23/2022 COMPLETED Review Details
04/01/2022 TENTATIVE PLAT REVIEW 05/12/2022 COMPLETED Review Details
05/24/2022 TENTATIVE PLAT REVIEW 06/08/2022 COMPLETED Review Details
09/19/2022 DEV PKG - OK TO SUBMIT 10/06/2022 COMPLETED Review Details
09/24/2021 DEV PKG - OK TO SUBMIT 10/04/2021 COMPLETED Review Details
10/04/2021 TENTATIVE PLAT REVIEW 11/26/2021 COMPLETED Review Details
10/06/2022 REVISION - - 1ST 10/18/2022 ACTIVE Review Details
06/12/2024 DEVELOPMENT PACKAGE REVIEW v.1 09/13/2024 APPROVED Review Details
02/14/2023 DEVELOPMENT PACKAGE REVIEW v.2 04/05/2023 APPROVED Review Details
10/28/2022 DEVELOPMENT PACKAGE REVIEW v.1 12/05/2022 REQUIRES RESUBMIT Review Details

Outstanding Inspections

Permit Status: Issued
Permit Number: DP21-0259
Permite Description: *Revision 2 (splash pad) started 6/12/2024* Tentative Plat - La Estancia, Parcels 6 thru 8. Parcel 6: Lots 1 thru 107, and Common Areas "A6" thr
Total Outstanding Inspections - 7
Last Inspection Date Description Inspector Results Comments
10/21/2022 SITE - Stormwater Follow-up N/A Re-inspection required
09/29/2023 SITE - Stormwater Final Inspection N/A Not Ready Complete all of the work on this site as shown on the Approved Drawings, provide Approved Drawings or Approved Revised Drawings for the Inspector to use during all Final Inspections. Once the Site has been Approved with Drawings you can then seek Final Approval and Closure for all open Permits as needed.

Prior to the Final Approval of this site you will need to provide the following Document/s before we can sign the project as finished and complete. Ensure that All Drawings represent the Site as it is, and that All Revision changes have been Submitted and Approved by the City of Tucson Review staff, no As-built Drawings will be accepted. Also provide a copy of the Notice Of Termination from the Arizona Department of Environmental Quality for the closing of the SWPPP for this Permit. Possible signed and Sealed Certification Letter from the Engineer of Record stating that the site was constructed per the Approved Drawings.
08/04/2023 COT - ENGR - Signage Final N/A Partial Pass Sign locations noted and to be verified by TDOD.
10/03/2023 PDSD Site/Engineering Division - Landscaping N/A Not Ready Complete all the work on this site as shown on the approved plans prior to calling in this inspection for a final
10/03/2023 ENGR Engineering Final N/A Not Ready Complete all the work on this site as shown on the approved plans prior to calling in this inspection for a final
10/27/2023 PDSD Site/Engineering Division - NPPO N/A Not Ready Provide the landscape plans that will be utilized for this site and all the other sites so that this work can be inspected and approved
12/22/2023 ENGR Grading Final N/A Complete (Recurring) Minor cleanup of the sites under construction at this time, general clean of the streets and the basins will be required before the final approval once all work has been completed per the Approved plans.

Completed Inspections

Permit Status: Issued
Permit Number: DP21-0259
Permit Description: *Revision 2 (splash pad) started 6/12/2024* Tentative Plat - La Estancia, Parcels 6 thru 8. Parcel 6: Lots 1 thru 107, and Common Areas "A6" thr
Total Completed Inspections - 4
Date Description Inspector Results Comments
07/15/2022 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 07/15/2022; Status: Approved; Inspector: DROBERTS; Comment: Entered by NGARCIA3 - IS APPROVED, COMMENTS HAVE ALREADY BEEN ADDED TO PERMITS PLUS.} ; {Activity date: 07/15/2022; Status: Approved; Inspector: DROBERT5; Comment: Entered by DROBERT5 - }
09/29/2023 SITE - SWPPP Violation Notice Passed
09/29/2023 SITE - SWPPP Correction Notice Passed
10/27/2023 SITE - Stormwater Setup and Controls Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
REV-2_LAE DP21-0259 DRAINAGE STATEMENT_1_V1.PDF DOCUMENTS VIEW
REV-2_LAE DP21-0259 TPLAT_1_V1.PDF DOCUMENTS VIEW