Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: DP21-0249
Permit Details
Status:
Inspections
Type:
Development Package
Address:
3002 S MISSION RD
Address NEW:
3002 S MISSION RD
Apply Date:
09/15/2021
Applicant:
David Evans
Description:
Tentative Plat/Floodplain - Val-Val. Lots 1 thru 11, and Common Area "A" (drainage).
Permit Reviews
Permit Number - DP21-0249
Permit Status: Inspections
Permit Description: Tentative Plat/Floodplain - Val-Val. Lots 1 thru 11, and Common Area "A" (drainage).
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/15/2021 | DEV PKG - OK TO SUBMIT | 09/27/2021 | COMPLETED |
| 09/27/2021 | TENTATIVE PLAT REVIEW | 11/08/2021 | COMPLETED |
| 06/01/2023 | DEVELOPMENT PACKAGE NEW v.1 | 06/21/2023 | REQUIRES RESUBMIT |
| 03/19/2024 | DEVELOPMENT PACKAGE NEW v.2 | 02/24/2025 | APPROVED |
| 04/05/2023 | DEVELOPMENT PACKAGE REVIEW v.2 | 05/01/2023 | REQUIRES RESUBMIT |
| 11/18/2022 | DEVELOPMENT PACKAGE REVIEW v.1 | 01/04/2023 | REQUIRES RESUBMIT |
Outstanding Inspections
Permit Status: Inspections
Permit Number: DP21-0249
Permite Description: Tentative Plat/Floodplain - Val-Val. Lots 1 thru 11, and Common Area "A" (drainage).
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/22/2025 | SITE - Stormwater Follow-up | N/A | Failed | Contractor needs to clean the road install track out rock and install wattles on the north end of the project. And not use the alleyway. |
| 05/15/2025 | SITE - Stormwater Setup and Controls | N/A | Complete (Recurring) | the swppp is in place.looks good no concerns at is time |
Completed Inspections
Permit Status: Inspections
Permit Number: DP21-0249
Permit Description: Tentative Plat/Floodplain - Val-Val. Lots 1 thru 11, and Common Area "A" (drainage).
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/26/2025 | PDSD Engineering Division Pre-Construction SITE | Passed | SWPPP will be incorporated once dirt has been brought to grade, track pad will be done immediately. Once SWPPP is posted we will do our initial inspection. One Palo-Verde will probably not be saved so the landscaping engineer will have to be involved in this decision moving forward with revision and answers. | |
| 03/26/2025 | NPPO Pre-Construction | Passed | See attached notes |
Scheduled Inspections
Scheduled Inspections - DP21-0249
Status: Inspections
Description: Tentative Plat/Floodplain - Val-Val. Lots 1 thru 11, and Common Area "A" (drainage).
| Scheduled Date | Description | Entered By | Entered Date |
|---|---|---|---|
| SITE - Stormwater Follow-up | Scheduled |
For information about today’s scheduled inspections please refer to the
PDSD Daily Inspections Dashboards (Desktop)
PDSD Daily Inspections Dashboards (Mobile)
.