Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Inspections
Type:
Development Package
Address NEW:
3002 S MISSION RD
Apply Date:
09/15/2021
Applicant:
David Evans
Description:
Tentative Plat/Floodplain - Val-Val. Lots 1 thru 11, and Common Area "A" (drainage).

Permit Reviews

Permit Number - DP21-0249
Permit Status: Inspections
Permit Description: Tentative Plat/Floodplain - Val-Val. Lots 1 thru 11, and Common Area "A" (drainage).
Start Date Submittal Complete Date Status  
09/15/2021 DEV PKG - OK TO SUBMIT 09/27/2021 COMPLETED Review Details
09/27/2021 TENTATIVE PLAT REVIEW 11/08/2021 COMPLETED Review Details
06/01/2023 DEVELOPMENT PACKAGE NEW v.1 06/21/2023 REQUIRES RESUBMIT Review Details
03/19/2024 DEVELOPMENT PACKAGE NEW v.2 02/24/2025 APPROVED Review Details
04/05/2023 DEVELOPMENT PACKAGE REVIEW v.2 05/01/2023 REQUIRES RESUBMIT Review Details
11/18/2022 DEVELOPMENT PACKAGE REVIEW v.1 01/04/2023 REQUIRES RESUBMIT Review Details

Outstanding Inspections

Permit Status: Inspections
Permit Number: DP21-0249
Permite Description: Tentative Plat/Floodplain - Val-Val. Lots 1 thru 11, and Common Area "A" (drainage).
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
09/22/2025 SITE - Stormwater Follow-up N/A Failed Contractor needs to clean the road install track out rock and install wattles on the north end of the project. And not use the alleyway.
05/15/2025 SITE - Stormwater Setup and Controls N/A Complete (Recurring) the swppp is in place.looks good no concerns at is time

Completed Inspections

Permit Status: Inspections
Permit Number: DP21-0249
Permit Description: Tentative Plat/Floodplain - Val-Val. Lots 1 thru 11, and Common Area "A" (drainage).
Total Completed Inspections - 2
Date Description Inspector Results Comments
03/26/2025 PDSD Engineering Division Pre-Construction SITE Passed SWPPP will be incorporated once dirt has been brought to grade, track pad will be done immediately. Once SWPPP is posted we will do our initial inspection. One Palo-Verde will probably not be saved so the landscaping engineer will have to be involved in this decision moving forward with revision and answers.
03/26/2025 NPPO Pre-Construction Passed See attached notes

Scheduled Inspections

Scheduled Inspections - DP21-0249
Status: Inspections
Description: Tentative Plat/Floodplain - Val-Val. Lots 1 thru 11, and Common Area "A" (drainage).
Scheduled Date Description Entered By Entered Date
SITE - Stormwater Follow-up Scheduled
For information about today’s scheduled inspections please refer to the PDSD Daily Inspections Dashboards (Desktop) PDSD Daily Inspections Dashboards (Mobile) .

Documents

File Name Document Type  
5_TENTATIVE PLAT FOR VAL-VAL, LOTS 1-10_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
2_DRAINAGE REPORT_V1.PDF PLANS UNDER REVIEW VIEW
1_TITLE REPORT.PDF PLANS UNDER REVIEW VIEW