Inspection History Details
Inspection Status: Scheduled
Inspection History: SITE - Stormwater Follow-up
Permit Number - DP21-0249
Inspection Description - SITE - Stormwater Follow-up
Inspection Status - Scheduled
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| SITE - Stormwater Follow-up | Scheduled | |||
| 09/19/2025 | SITE - Stormwater Follow-up | Failed | Trackout pad is insufficient. Correct within 48 hours or a Stop Work order will be issued . | |
| 09/22/2025 | SITE - Stormwater Follow-up | Failed | Contractor needs to clean the road install track out rock and install wattles on the north end of the project. And not use the alleyway. |