Inspection Status: Scheduled
Inspection History: SITE - Stormwater Follow-up
| Date |
Description |
Inspector |
Results |
Comments |
|
SITE - Stormwater Follow-up
|
|
Scheduled |
|
| 09/19/2025 |
SITE - Stormwater Follow-up
|
|
Failed |
Trackout pad is insufficient. Correct within 48 hours or a Stop Work order will be issued . |
| 09/22/2025 |
SITE - Stormwater Follow-up
|
|
Failed |
Contractor needs to clean the road install track out rock and install wattles on the north end of the project. And not use the alleyway. |