Permit Details

Status:
Issued
Type:
Development Package
Apply Date:
09/14/2021
Applicant:
Description:
Site/Grading - Wendys Restaurant, The Bridges Sub-Area B-3. Lot 3.

Permit Reviews

Permit Number - DP21-0246
Permit Status: Issued
Permit Description: Site/Grading - Wendys Restaurant, The Bridges Sub-Area B-3. Lot 3.
Start Date Submittal Complete Date Status  
01/05/2022 DEV PKG - RESUBMITTAL 04/01/2022 COMPLETED Review Details
07/06/2022 DEV PKG - OK TO SUBMIT 07/19/2022 COMPLETED Review Details
07/19/2022 DEV PKG - REVISION 09/02/2022 COMPLETED Review Details
09/14/2021 DEV PKG - OK TO SUBMIT 09/27/2021 COMPLETED Review Details
09/27/2021 DEV PKG 12/09/2021 COMPLETED Review Details
04/05/2023 DEVELOPMENT PACKAGE REVIEW v.1 05/10/2023 APPROVED Review Details

Conditions

Permit Number - DP21-0246
Permit Status: Issued
Permit Description: Site/Grading - Wendys Restaurant, The Bridges Sub-Area B-3. Lot 3.
Date Description Comments
09/12/2022 Revised drawings required for change to roof drains before final inspection

Outstanding Inspections

Permit Status: Issued
Permit Number: DP21-0246
Permite Description: Site/Grading - Wendys Restaurant, The Bridges Sub-Area B-3. Lot 3.
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
04/07/2023 SITE - Stormwater Follow-up N/A Complete (Recurring)
04/07/2023 ENGR Grading Final N/A Partial Pass Contractor to provide handrail

Completed Inspections

Permit Status: Issued
Permit Number: DP21-0246
Permit Description: Site/Grading - Wendys Restaurant, The Bridges Sub-Area B-3. Lot 3.
Total Completed Inspections - 5
Date Description Inspector Results Comments
07/12/2023 SITE - Stormwater Follow-up Passed contractor is looking for T .C O Im good with it .
contractor need to install the handrail and the address the slope at the southwest end of the project by the trash enclosure.
07/12/2023 SITE - Stormwater Final Inspection Passed
07/12/2023 SITE - Stormwater Setup and Controls Passed
12/11/2023 ENGR Engineering Final Passed
01/10/2024 ENGR Grading Final Passed