Permit: DP21-0209
Permit Details
Status:
Complete
Type:
Development Package
Address:
975 N CIRCLE D WY
Address NEW:
975 N CIRCLE D WY
Apply Date:
08/13/2021
Applicant:
Alexander Carrillo
Description:
Site/Grading/Floodplain - Carrillo Residence.
Permit Reviews
Permit Number - DP21-0209
Permit Status: Complete
Permit Description: Site/Grading/Floodplain - Carrillo Residence.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 08/13/2021 | DEV PKG - OK TO SUBMIT | 08/20/2021 | COMPLETED |
| 08/20/2021 | DEV PKG | 09/17/2021 | COMPLETED |
| 10/18/2021 | DEV PKG - RESUBMITTAL | 11/12/2021 | COMPLETED |
Outstanding Inspections
Permit Status: Complete
Permit Number: DP21-0209
Permite Description: Site/Grading/Floodplain - Carrillo Residence.
Total Outstanding Inspections - 6
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/27/2022 | PDSD Site/Engineering Division - Landscaping | N/A | Not Ready | |
| 10/26/2022 | PDSD Site/Engineering Division - NPPO | N/A | Not Ready | |
| 10/26/2022 | SITE - Stormwater Final Inspection | N/A | Not Ready | |
| 10/27/2022 | COT - ENGR - Signage Final | N/A | Not Ready | |
| 09/26/2023 | SITE - Stormwater Follow-up | N/A | Not Ready | storm water holding tank not installed nor on site. |
| 05/31/2023 | ENGR Engineering Final | N/A | Not Ready |
Completed Inspections
Permit Status: Complete
Permit Number: DP21-0209
Permit Description: Site/Grading/Floodplain - Carrillo Residence.
Total Completed Inspections - 6
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/01/2023 | PDSD Engineering Division Pre-Construction SITE | Passed | residential project. Builder on site Anthony at 520-247-0308. Building nearing completion. Site work in progress. Changes to drainage. Pattern shall be addressed by project engineer. All changes shall go through City of Tucson plan revision. Complete all work, Stabilize all disturbed earth. Remove all construction debris from surrounding desert and water pathways. Schedule all inspections shown on permit. | |
| 07/05/2023 | SITE - Stormwater Setup and Controls | Passed | ||
| 07/05/2023 | SITE - SWPPP Violation Notice | Passed | ||
| 07/05/2023 | SITE - SWPPP Correction Notice | Passed | Inspection not applicable | |
| 09/26/2023 | ENGR Grading Final | Passed | reviewed “Earthwork Special Inspection Compliance Statement “ performed by Southern Arizona Testing Lab dated March 10, 2022 to April 29, 2022. Minimum compaction requirements is 95% of three soil proctors. all tests passed. | |