Apply Date:
02/12/2021
Applicant:
Description:
Site/Grading - Anytime Storage.

Permit Reviews

Permit Number - DP21-0044
Permit Status: Complete
Permit Description: Site/Grading - Anytime Storage.
Start Date Submittal Complete Date Status  
02/02/2022 DEV PKG - RESUBMITTAL 03/10/2022 COMPLETED Review Details
02/12/2021 DEV PKG - OK TO SUBMIT 02/19/2021 COMPLETED Review Details
02/19/2021 DEV PKG 03/30/2021 COMPLETED Review Details
09/02/2021 DEV PKG - RESUBMITTAL 10/27/2021 COMPLETED Review Details

Outstanding Inspections

Permit Status: Complete
Permit Number: DP21-0044
Permite Description: Site/Grading - Anytime Storage.
Total Outstanding Inspections - 5
Last Inspection Date Description Inspector Results Comments
07/29/2022 SITE - Stormwater Follow-up N/A Complete (Recurring) {Activity date: 07/29/2022; Status: Continued; Inspector: BBENEDON; Comment: Entered by NGARCIA3 - Continued. No issues at this time minor track out noted. Mud contained within jobsite}
12/16/2022 ENGR Grading Final N/A Complete (Recurring) Inspected trash enclosure slab for the future poor, minor adjustments to the approach slab required an additional adobes underneath the rebar required photographs to follow showing corrections.
04/04/2023 COT - ENGR - Signage Final N/A Complete (Recurring) There is no sign in place
03/15/2023 ENGR Engineering Final N/A Complete (Recurring) Contractors that completed the project yet continue planting the plants installing DJ HYDROSEEDING in the back area where the desert is with the contractor disturbed all of that
04/04/2023 PDSD Site/Engineering Division - Landscaping N/A Partial Pass The last time I was here I informed the contractor that all disturb areas needed HYDROSEEDING the area in question is just North of the fence on the north side all that area that was used as a parking lot need to be hydroseed if you have any questions call David Roberts

Completed Inspections

Permit Status: Complete
Permit Number: DP21-0044
Permit Description: Site/Grading - Anytime Storage.
Total Completed Inspections - 9
Date Description Inspector Results Comments
03/15/2023 SITE - Stormwater Setup and Controls Passed
03/15/2023 SITE - Stormwater Final Inspection Passed
03/15/2023 SITE - SWPPP Correction Notice Passed
03/15/2023 PDSD Site/Engineering Division - NPPO Passed
03/15/2023 ENGR Grading Final Passed
03/15/2023 SITE - SWPPP Violation Notice Passed
03/15/2023 PDSD Engineering Division Pre-Construction SITE Passed
04/20/2023 COT - ENGR - Signage Final Passed
05/22/2023 PDSD Site/Engineering Division - Landscaping Passed