Permit Details

Status:
Issued
Type:
Development Package
Address:
3156 W SALVIA DR
Address NEW:
3156 W SALVIA DR
Apply Date:
01/12/2021
Applicant:
Brock ONeill
Description:
SITE/ GRADING - Montage Vista, Phase 2, Lot 70.

Permit Reviews

Permit Number - DP21-0011
Permit Status: Issued
Permit Description: SITE/ GRADING - Montage Vista, Phase 2, Lot 70.
Start Date Submittal Complete Date Status  
01/12/2021 DEV PKG - OK TO SUBMIT 01/18/2021 COMPLETED Review Details
12/01/2020 DEV PKG 01/21/2021 COMPLETED Review Details
01/23/2023 DEVELOPMENT PACKAGE REVIEW v.1 01/30/2023 APPROVED Review Details
03/02/2023 DEVELOPMENT PACKAGE REVIEW v.1 04/20/2023 APPROVED Review Details

Outstanding Inspections

Permit Status: Issued
Permit Number: DP21-0011
Permite Description: SITE/ GRADING - Montage Vista, Phase 2, Lot 70.
Total Outstanding Inspections - 6
Last Inspection Date Description Inspector Results Comments
10/06/2021 PDSD Site/Engineering Division - NPPO N/A Complete (Recurring) {Activity date: 10/06/2021; Status: Continued; Inspector: BBENEDON; Comment: Entered by NGARCIA3 - . Continued. Lot was previously graded. Natural hesitation was left undisturbed outside of grade limits}
10/07/2022 SITE - Stormwater Follow-up N/A Complete (Recurring) {Activity date: 10/07/2022; Status: Continued; Inspector: BBENEDON; Comment: Entered by NGARCIA3 - Continued. Large material and debris piles on site. Provide concrete containment as required.} ; {Activity date: 09/16/2022; Status: Continued; Inspector: BBENEDON; Comment: Entered by VVERA1 - continued} ; {Activity date: 07/28/2022; Status: Continued; Inspector: BBENEDON; Comment: Entered by NGARCIA3 - Continued. No issues since last rain event} ; {Activity date: 07/14/2022; Status: Continued; Inspector: BBENEDON; Comment: Entered by NGARCIA3 - Continued. Ongoing construction no issues or concerns at this time.} ; {Activity date: 06/22/2022; Status: Continued; Inspector: BBENEDON; Comment: Entered by VVERA1 - continued. no issues at this time. Material piles appear to be for the other two residential projects in this cul-de-sac.} ; {Activity date: 06/01/2022; Status: Continued; Inspector: BBENEDON; Comment: Entered by VVERA1 - Continued. Trash and material storage within right of way additionally other construction sites have materials piled in cul-de-sac} ; {Activity date: 05/26/2022; Status: Continued; Inspector: BBENEDON; Comment: Entered by VVERA1 - Continued} ; {Activity date: 05/17/2022; Status: Continued; Inspector: BBENEDON; Comment: Entered by NGARCIA3 - Continued. Trash and material containers in right of way. Building construction in progress. No site work at this time} ; {Activity date: 04/20/2022; Status: Continued; Inspector: BBENEDON; Comment: Entered by VVERA1 - Continued} ; {Activity date: 04/07/2022; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by NGARCIA3 - CN NO CONCERNS.

} ; {Activity date: 12/15/2021; Status: Continued; Inspector: BBENEDON; Comment: Entered by NGARCIA3 - Continued. No issues after last rain event} ; {Activity date: 11/10/2021; Status: Continued; Inspector: BBENEDON; Comment: Entered by VVERA1 - Continued. All dirt and debris contained on site.} ; {Activity date: 09/28/2021; Status: Continued; Inspector: BBENEDON; Comment: Entered by VVERA1 - 09154. Continued

} ; {Activity date: 09/24/2021; Status: Continued; Inspector: BBENEDON; Comment: Entered by VVERA1 - 09154. Continued. No issues or concerns at this time.

}
10/07/2022 SITE - Stormwater Setup and Controls N/A Complete (Recurring) {Activity date: 10/07/2022; Status: Continued; Inspector: BBENEDON; Comment: Entered by NGARCIA3 - Continued. Large material and debris piles on site. Provide concrete containment as required.} ; {Activity date: 04/06/2022; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by VVERA1 - Partially approved. Wynn Beck.} ; {Activity date: 09/23/2021; Status: Continued; Inspector: BBENEDON; Comment: Entered by NGARCIA3 - Continued. No controls installed at this time. Provide controls as needed.}
11/22/2022 SITE - Stormwater Final Inspection N/A Complete (Recurring) Not ready at this time. Work in progress. Material piles on site. Trashcan in right of way. Temporary facilities on site
02/27/2023 PDSD Site/Engineering Division - Landscaping N/A Not Ready THE GATE CODE FOR THIS SITEIS AS FOLLOWS #9031. CONTACT DAVID ROBERTS FOR COMMENTS ON THIS SITE ON 2/28/2023 THE FOLLOWING ITEMS HAVE BEEN FOUND TO BE INCOMPLETE AT THIS TIME: 1) THE 6” DRAINAGE SWALES THAT WERE CALLED OU AT THE TOP AND BOTTOMS OF THE ROCK SLOPES HAVE NOT BEEN INSTALLED AS SHOWN ON THE APPROVED PLANS. PROVIDE THE GEOTECHNICAL REPORT AND APPROVED REVISED DRAWINGS FOR THESE CHANGES. 2) THE DRIVEWAY AND ADJACENT SIDEWALK’S HAVE BEEN DAMAGED DURING THE CONSTRUCTION OF THE SITE. THESE AREAS WILL HAVE TO BE REMOVED AND REPLACED PRIOR TO THE CLOSURE OF THIS SITE DEVELOPMENT PACKAGE AND BUILDING PERMIT. 3) THE SLOPES FROM THE SIDEWALK INTO THE PROPERTY WERE APPROVED TO BE BETWEEN 4.2:1 to 5.2:1, THEY ARE STEEPER AND UNSTABLE IN SOME AREAS. REDO THESE SLOPES OR PROVIDE AN APPROVED DRAWINGS FOR ALL CHANGES THAT HAVE BEEN MADE TO THIS SITE PRIOR TO THE FINAL APPROVAL OF THIS SITE PERMIT/DEVELOPMENT PACKAGE.
03/14/2023 ENGR Engineering Final N/A Not Ready Inspection called in for clarification work that still needs to be completed

Completed Inspections

Permit Status: Issued
Permit Number: DP21-0011
Permit Description: SITE/ GRADING - Montage Vista, Phase 2, Lot 70.
Total Completed Inspections - 4
Date Description Inspector Results Comments
02/24/2023 SITE - Stormwater Final Inspection Passed
02/24/2023 PDSD Engineering Division Pre-Construction SITE Passed
02/24/2023 ENGR Grading Final Passed
02/24/2023 COT - ENGR - Signage Final Passed

Documents

File Name Document Type  
PERMIT DP21-0011 _ FILE NAME 1-1 OF 1.PDF _ DOC TYPE DEVELOPMENT PACKA..._V1.PDF DOCUMENTS VIEW
3156 W SALVIA DR CUT SLOPE STABILITY_V1.PDF DOCUMENTS VIEW
SIGNED SUMMARY LETTER_V1.PDF DOCUMENTS VIEW
APPROVED GRADING_LOT70-LOT70_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
GRADING_LOT70-LOT 70_V1.PDF DOCUMENTS VIEW
3156 W SALVIA DR CUT SLOPE STABILITY_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
PERMIT DP21-0011 _ FILE NAME 1-1 OF 1.PDF _ DOC TYPE DEVELOPMENT PACKA..._V1.PDF DOCUMENTS VIEW
1-1 OF 1.PDF DEVELOPMENT PACKAGE VIEW
CONTRACTOR LETTER.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
GEOTECH_ROCK_SLOPES, YEAR 2006.PDF DOCUMENTS VIEW
GEOTECH_REPORT, YEAR 2002.PDF DOCUMENTS VIEW
ONLINE FILEDROP PAGE, SUBMITTED ON 11.23.2020.PDF DOCUMENTS VIEW