Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: DP20-0254
Permit Details
Apply Date:
12/14/2020
Applicant:
Description:
Grading - Houghton Reserve, Phase 1, Private Paving. Lots 1- 146 and Common Areas A-1, A-2, B-1, B-3
Permit Reviews
Permit Number - DP20-0254
Permit Status: Issued
Permit Description: Grading - Houghton Reserve, Phase 1, Private Paving. Lots 1- 146 and Common Areas A-1, A-2, B-1, B-3
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
04/16/2021 | GRADING | 05/21/2021 | COMPLETED |
12/14/2020 | DEV PKG - OK TO SUBMIT (GRADING ONLY) | 12/16/2020 | COMPLETED |
12/16/2020 | GRADING | 02/12/2021 | COMPLETED |
Outstanding Inspections
Permit Status: Issued
Permit Number: DP20-0254
Permite Description: Grading - Houghton Reserve, Phase 1, Private Paving. Lots 1- 146 and Common Areas A-1, A-2, B-1, B-3
Total Outstanding Inspections - 9
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/27/2022 | ENGR Engineering Final | N/A | Not Ready | |
10/26/2022 | SITE - Stormwater Final Inspection | N/A | Not Ready | |
10/27/2022 | PDSD Site/Engineering Division - Landscaping | N/A | Not Applicable | |
10/26/2022 | PDSD Site/Engineering Division - NPPO | N/A | Not Ready | |
10/26/2022 | SITE - Stormwater Setup and Controls | N/A | Not Ready | |
04/11/2023 | PDSD Engineering Division Pre-Construction SITE | N/A | Partial Pass | Dave Dobson at 631-2950. New superintendent on site. Please schedule biweekly inspections for SWPPP inspections And schedule inspections for all stormwater systems during installation. |
10/27/2022 | COT - ENGR - Signage Final | N/A | Not Ready | |
10/26/2022 | SITE - Stormwater Follow-up | N/A | Not Ready | |
10/27/2022 | ENGR Grading Final | N/A | Not Ready |
Completed Inspections
Permit Status: Issued
Permit Number: DP20-0254
Permit Description: Grading - Houghton Reserve, Phase 1, Private Paving. Lots 1- 146 and Common Areas A-1, A-2, B-1, B-3
Total Completed Inspections - 3
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/22/2023 | SITE - Stormwater Setup and Controls | Passed | All are in place | |
11/22/2023 | PDSD Engineering Division Pre-Construction SITE | Passed | ||
11/22/2023 | COT - ENGR - Signage Final | Passed | Set backs are, side 20’ front 51’ |