Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.

Permit Details

Status:
Complete
Type:
Development Package
Apply Date:
11/12/2020
Applicant:
Description:
Tentative Plat - Valencia Crossing. Lots 1-161. Common Areas A-1 to A-2, (landscape, grading, draina

Permit Reviews

Permit Number - DP20-0232
Permit Status: Complete
Permit Description: Tentative Plat - Valencia Crossing. Lots 1-161. Common Areas A-1 to A-2, (landscape, grading, draina
Start Date Submittal Complete Date Status  
02/22/2021 TENTATIVE PLAT REVIEW 04/05/2021 COMPLETED Review Details
05/14/2021 TENTATIVE PLAT REVIEW 06/09/2021 COMPLETED Review Details
06/21/2021 TENTATIVE PLAT REVIEW 07/06/2021 COMPLETED Review Details
09/22/2021 REVISION - - 1ST 09/23/2021 COMPLETED Review Details
11/12/2020 DEV PKG - OK TO SUBMIT 11/19/2020 COMPLETED Review Details
11/18/2020 TENTATIVE PLAT REVIEW 02/01/2021 COMPLETED Review Details
02/04/2026 BUILDING DEFERRED SUBMITTAL REVIEW v.1 02/24/2026 APPROVED Review Details

Outstanding Inspections

Permit Status: Complete
Permit Number: DP20-0232
Permite Description: Tentative Plat - Valencia Crossing. Lots 1-161. Common Areas A-1 to A-2, (landscape, grading, draina
Total Outstanding Inspections - 7
Last Inspection Date Description Inspector Results Comments
10/27/2022 PDSD Site/Engineering Division - Landscaping N/A Not Ready
10/26/2022 PDSD Site/Engineering Division - NPPO N/A Not Ready
10/26/2022 SITE - Stormwater Final Inspection N/A Not Ready
10/27/2022 COT - ENGR - Signage Final N/A Not Ready
11/21/2023 ENGR Grading Final N/A Not Ready
11/21/2023 SITE - Stormwater Setup and Controls N/A Not Ready Storm water controls have not yet been implemented on this phase as of yet.
08/15/2024 SITE - Stormwater Follow-up N/A Complete (Recurring) Inlets at the cull de sac are a disaster, need to be rectified asap, this phase needs sever cleanup on all streets. Pictures attached

Completed Inspections

Permit Status: Complete
Permit Number: DP20-0232
Permit Description: Tentative Plat - Valencia Crossing. Lots 1-161. Common Areas A-1 to A-2, (landscape, grading, draina
Total Completed Inspections - 2
Date Description Inspector Results Comments
10/08/2021 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 10/08/2021; Status: Approved; Inspector: DROBERTS; Comment: Entered by VVERA1 - INSPECTION 09150 ENGINEERING - PRE-CON IS APPROVED
}
02/24/2026 ENGR Engineering Final Passed