Permit: DP20-0225
Permit Details
Apply Date:
10/30/2020
Applicant:
James Wright
Description:
Site/Grading/Floodplain - L&L Manufactured Components, drainage improvements/culverts.
Permit Reviews
Permit Number - DP20-0225
Permit Status: Complete
Permit Description: Site/Grading/Floodplain - L&L Manufactured Components, drainage improvements/culverts.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/14/2021 | DEV PKG - RESUBMITTAL | 04/15/2021 | COMPLETED |
| 10/30/2020 | DEV PKG - OK TO SUBMIT | 11/04/2020 | COMPLETED |
| 11/04/2020 | DEV PKG | 01/25/2021 | COMPLETED |
Outstanding Inspections
Permit Status: Complete
Permit Number: DP20-0225
Permite Description: Site/Grading/Floodplain - L&L Manufactured Components, drainage improvements/culverts.
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/13/2023 | ENGR Grading Final | N/A | Complete (Recurring) | Mike McNairy 5202477849. Box culvert at L&L Manufacturing. Grading in progress. Footings and formwork to begin next week. Schedule inspections as needed. Photo documentation may be helpful. Ensure no offsite discharge of materials, and or clean/remove said materials. |
Completed Inspections
Permit Status: Complete
Permit Number: DP20-0225
Permit Description: Site/Grading/Floodplain - L&L Manufactured Components, drainage improvements/culverts.
Total Completed Inspections - 9
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/05/2023 | PDSD Site/Engineering Division - Landscaping | Passed | ||
| 05/05/2023 | PDSD Site/Engineering Division - NPPO | Passed | N/A | |
| 05/05/2023 | ENGR Engineering Final | Passed | N/A | |
| 05/05/2023 | SITE - Stormwater Follow-up | Passed | N/A | |
| 05/05/2023 | ENGR Grading Final | Passed | This project has been certified mail letter dated on May 2, 2023 from Jim Wright Stantec | |
| 05/05/2023 | SITE - Stormwater Final Inspection | Passed | PROVIDE NOTICE OF TERMINATION LETTER FORTHE SWPPP’s FOR THIS DEVELOPMENT PACKAGE. | |
| 05/05/2023 | SITE - Stormwater Setup and Controls | Passed | N/A | |
| 05/05/2023 | PDSD Engineering Division Pre-Construction SITE | Passed | N/A | |
| 05/05/2023 | COT - ENGR - Signage Final | Passed | N/A |