Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR Grading Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/27/2022 | ENGR Grading Final | Not Ready | ||
| 10/27/2022 | ENGR Grading Final | Not Ready | ||
| 10/27/2022 | ENGR Grading Final | Not Ready | ||
| 10/27/2022 | ENGR Grading Final | Not Ready | ||
| 01/13/2023 | ENGR Grading Final | Complete (Recurring) | Mike McNairy 5202477849. Box culvert at L&L Manufacturing. Grading in progress. Footings and formwork to begin next week. Schedule inspections as needed. Photo documentation may be helpful. Ensure no offsite discharge of materials, and or clean/remove said materials. |
|
| 04/05/2023 | ENGR Grading Final | Complete (Recurring) | ||
| 04/05/2023 | ENGR Grading Final | Complete (Recurring) | Superintendent on site Scott. Grading contractor, Bucky strong. Stormwater structure. Inspected by others according to Scott. | |
| 04/12/2023 | ENGR Grading Final | Partial Pass | ||
| 04/19/2023 | ENGR Grading Final | Complete (Recurring) | ||
| 04/19/2023 | ENGR Grading Final | Complete (Recurring) | Bucky Strunk preparation for gunite |
|
| 05/05/2023 | ENGR Grading Final | Passed | This project has been certified by Jim Wright, project manager and engineer for Stan tech with a letter dated May 2, 2023 | |
| 05/05/2023 | ENGR Grading Final | Passed | This project has been certified hi Jim Wright, project manager and engineer from Stan tech with a certification letter dated May 2, 2023 | |
| 05/05/2023 | ENGR Grading Final | Passed | This project has been certified mail letter dated on May 2, 2023 from Jim Wright Stantec | |
| 05/05/2023 | ENGR Grading Final | Passed | This project has been signed off by Jim. Write the engineer for the project with Stantec With a certification letter dated May 2, 2023 |