Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Development Package
Address:
3550 E CORONA RD
Apply Date:
10/26/2020
Applicant:
Paul Iezzi
Description:
GRADING - Project Merlin, commercial storage.

Permit Reviews

Permit Number - DP20-0218
Permit Status: Complete
Permit Description: GRADING - Project Merlin, commercial storage.
Start Date Submittal Complete Date Status  
11/02/2020 DEV PKG - OK TO SUBMIT 11/03/2020 COMPLETED Review Details
11/03/2020 DEV PKG 11/20/2020 STOPPED Review Details
11/25/2020 GRADING 12/02/2020 COMPLETED Review Details

Completed Inspections

Permit Status: Complete
Permit Number: DP20-0218
Permit Description: GRADING - Project Merlin, commercial storage.
Total Completed Inspections - 9
Date Description Inspector Results Comments
12/17/2020 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 12/17/2020; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
10/07/2021 SITE - Stormwater Follow-up Passed {Activity date: 10/07/2021; Status: Approved; Inspector: MHERNANDEZ; Comment: Entered by VVERA1 - INSPECTION 09154 STORMWATER FOLLOW UP APPROVED
} ; {Activity date: 06/17/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by VLEON1 - } ; {Activity date: 06/07/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by VLEON1 - CONTINUE DRAINAGE IS WORKING} ; {Activity date: 03/31/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by RSALDAT1 - CN POURES TH LL FOR THE RCBC STATION 24 15 to 25 27 cL.} ; {Activity date: 03/09/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by VLEON1 - CONTINUE NEED MAINTENANCE THE WASHOUT} ; {Activity date: 03/08/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by VLEON1 - CN MET WITH DAVID ROBERTS ON SITE .INFORMED THE CONTRACTOR NOT TO OVER BACK FILL THE THE WATER HARVEST AREAS.} ; {Activity date: 03/02/2021; Status: Continued; Inspector: DROBERTS; Comment: Entered by VLEON1 - CONTINUED AT THIS TIME. I HAVE ADVISED THE CONTRACTOR THAT THEY NEED TO WORK ON THE CONCRETE WASHOUT FOR THIS SITE. CURRENTLY THEY HAVE DEPOSITED THE CONCRETE IN AN OPEN AREA AND HAVE NOT CONTAINED IT. THEY HAVE BEEN ADVISED TO CREATE A WASHOUT AREA THAT IS PLASTIC LINED TO ENSURE THAT NOTHING IS LEACHING INTO THE SOILS.} ; {Activity date: 02/26/2021; Status: Continued; Inspector: DROBERTS; Comment: Entered by DROBERT5 - DROVE THROUGH THE SITE AND VERIFIED THAT THERE WERE NO STORMWATER CONCERNS AT THAT TIME. THIS INSPECTION WILL BE RESCHEDULED FOR 3/2/2021 TO MEET WITH THE CONTRACTOR ON SITE TO WALK THE PROJECT.} ; {Activity date: 01/22/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by VLEON1 - CONTINUE CONTRACTOR HAS NOT RECEIVED THE PERMIT YET}
10/22/2021 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 10/22/2021; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
10/22/2021 PDSD Site/Engineering Division - NPPO Passed {Activity date: 10/22/2021; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
10/22/2021 ENGR Grading Final Passed {Activity date: 10/22/2021; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
10/22/2021 SITE - Stormwater Setup and Controls Passed {Activity date: 10/22/2021; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 03/10/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by VLEON1 - SWPP NEEDS TO BE MAINTAINED}
10/22/2021 COT - ENGR - Signage Final Passed {Activity date: 10/22/2021; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
10/26/2021 ENGR Engineering Final Passed {Activity date: 10/26/2021; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
10/26/2021 SITE - Stormwater Final Inspection Passed {Activity date: 10/26/2021; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }

Documents

File Name Document Type  
DP20-0218_NP_MONITORING_RPT1.PDF DEVELOPMENT PACKAGE VIEW
CONTRACTOR LETTER DOCUMENTS VIEW
PERMIT DOCUMENTS VIEW
1-75 OF 75 DEVELOPMENT PACKAGE VIEW
APPLICATION,11.25.20.PDF DOCUMENTS VIEW
DRAINAGE REPORT.PDF DOCUMENTS VIEW
FLOODPLAINUSEPERMITAPPLICATION, SIGNED.PDF DOCUMENTS VIEW
GEOTECHNICAL REPORT.PDF DOCUMENTS VIEW
SEWERCAPACITYRESPP20WC00195, PIMA COUNTY.PDF DOCUMENTS VIEW
TRAFFIC IMPACT STATEMENT.PDF DOCUMENTS VIEW
SWPPP REPORT, 352 PAGES.PDF DOCUMENTS VIEW