Inspection History Details
Inspection Status: Passed
Inspection History: ENGR Grading Final
Permit Number - DP20-0218
Inspection Description - ENGR Grading Final
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/07/2021 | ENGR Grading Final | MHERNANDEZ | Approved | Entered by VVERA1 - INSPECTION 09185 GRADING - INTERMEDIATE APPROVED |
06/17/2021 | ENGR Grading Final | MHERNANDEZ | Continued | Entered by VLEON1 - CN/ PAVING THE WEST SIDE OF THR BUILDING PARKING LOT. |
06/07/2021 | ENGR Grading Final | MHERNANDEZ | Continued | Entered by VLEON1 - |
04/02/2021 | ENGR Grading Final | MHERNANDEZ | Continued | Entered by RSALDAT1 - CN FORMING THE TOP OF THE RCBC .STATION24 15To 25 27 cL. Conversation with Bill from catamount informed him the Catamount need to start schedule inspection for them self. The side walk scupper that was poured need to have the engineer of record sign off on them. |
04/01/2021 | ENGR Grading Final | MHERNANDEZ | Continued | Entered by VLEON1 - CONTINUE NO ACTIVITY ON THE CHANNEL |
03/31/2021 | ENGR Grading Final | MHERNANDEZ | Continued | Entered by RSALDAT1 - cn |
03/30/2021 | ENGR Grading Final | MHERNANDEZ | Continued | Entered by VLEON1 - CHECK ON THE REQUIREMENTS FOR INSPECTIONS AFTER THIS WEEK POURING THE RCBC TOMORROW |
03/25/2021 | ENGR Grading Final | MHERNANDEZ | Continued | Entered by VLEON1 - SHOTCRETE THE WALLS FOR THE CHANNEL LEFT SIDE .FORMING THE WALL FOR THE RCBC STATION 24 15 to 25 27 LC. SHOTCRETE STATION 20 05 LT. To 19 70 LT.. No inspection yesterday. |
03/23/2021 | ENGR Grading Final | MHERNANDEZ | Continued | Entered by RSALDAT1 - CN PLACEMENT OF SHOTCRETE ON THE LT. SIDE OF THE CHANNEL STATION 23 40 LT. TO 21 25 LT. 150 LF. |
03/22/2021 | ENGR Grading Final | MHERNANDEZ | Continued | Entered by VLEON1 - CONTINUE - EXCAVATING FOR THE TOE ON THE LEFT SIDE OF THE CHANNEL WALL. POURING THE FLOOR FOR THE TWO CELL RCBS STATION 24 15 TO 25 27 CL. POURED THE RCBS AT STATION 15 00 TO 15 77 CL. |
03/22/2021 | ENGR Grading Final | MHERNANDEZ | Continued | Entered by VLEON1 - CONTINUE. EXCAVATING FOR THE TOE ON THE LEFT SIDE OF THE CHANNEL WALL. POURING THE FLOOR FOR THE TWO CELL RCBC STATION 24 15 to 25 27 CL. |
03/19/2021 | ENGR Grading Final | DROBERTS | Continued | Entered by VLEON1 - CONTINUED, CREWS HAVE COMPLETED THE SOUTH SIDE OF THE GUNITE CHANNEL UP TO APPROXIMATELY STATION 14 50, 50 FEET EAST OF THE WESTERN BOX CULVERT. ALSO THEY CONTINUE TO THE PLACEMENT OF ABC FOR THE SOUTHERN PARKING LOT SOUTH OF THE GUNITE DRAINAGE CHANNEL. THIS WILL CONTINUE NEXT WEEK, ONCE IT IS DONE THEY WILL CONSTRUCT THE PARKING LOT. |
03/18/2021 | ENGR Grading Final | MHERNANDEZ | Continued | Entered by VLEON1 - CN. POURING SHOTCRETE FROM STATION 18 45 RT TO 16 00 RT. 245 LF. Channel |
03/17/2021 | ENGR Grading Final | MHERNANDEZ | Continued | Entered by RSALDAT1 - CN. POURING SHOTCRETE FEOM STATION 20 25 RT. to18 45 RT. 180 LF. |
03/16/2021 | ENGR Grading Final | MHERNANDEZ | Continued | Entered by VLEON1 - CONTINUE NOT POURING SHOTCRETE TODAY, RAIN DAY |
03/15/2021 | ENGR Grading Final | MHERNANDEZ | Continued | Entered by VLEON1 - CN POURED 165 LF. OF SHOTCRETE ON THE CHANNEL ON FRIDAY STATION 23 40 RT.. To 21 75 RT. TODAY POURING SHOTCRETE FROM STATION 21 75 RT. TO 20 25 RT. 150 LF. |
03/12/2021 | ENGR Grading Final | DROBERTS | Continued | Entered by RSALDAT1 - CONTINUED AT THIS TIME. THE CONCRETE CREW IS WORKING ON THE PLACEMENT OF GUNITE FOR THE DRAINAGE CHANNEL ON THE SOUTH SIDE. THEY STARTED APPROXIMATELY 50 FEET WEST OF THE EASTERN BOX CHANNEL AND COMPLETED APPROXIMATELY 160 FEET ON GUNITE ON THE SOUTH WALL. |
03/11/2021 | ENGR Grading Final | MHERNANDEZ | Continued | Entered by VLEON1 - CONTINUE - WILL BE POURING THE WALLS FOR THE CHANNEL . NEED TO MAINTENANCE THE CONCRETE WASHOUT AREA. |
03/10/2021 | ENGR Grading Final | MHERNANDEZ | Continued | Entered by VLEON1 - |
03/09/2021 | ENGR Grading Final | MHERNANDEZ | Continued | Entered by VLEON1 - |
03/02/2021 | ENGR Grading Final | DROBERTS | Continued | Entered by VLEON1 - CONTINUED AT THIS TIME. THE CREWS ARE WORKING ON THE PARKING LOT LOCATED AT THE SOUTHEAST CORNER OF THE SITE, THE SOUTHERN BASINS AND DRAINAGE CHANNELS AND GENERAL SITE PREP ALONG ALVERNON ROAD IN THE RUGHT OF WAY. |
10/22/2021 | ENGR Grading Final | DROBERTS | Approved | Entered by DROBERT5 - |
10/22/2021 | ENGR Grading Final | DROBERTS | Approved | Entered by DROBERT5 - |
10/22/2021 | ENGR Grading Final | DROBERTS | Approved | Entered by DROBERT5 - |
05/05/2021 | ENGR Grading Final | MHERNANDEZ | Continued | Entered by VLEON1 - CONTINUE - REBAR FOR SCUPPERS |