Inspection Status: Passed

Inspection History: ENGR Grading Final

Permit Number - DP20-0218

Inspection Description - ENGR Grading Final

Inspection Status - Passed

Date Description Inspector Results Comments
10/07/2021 ENGR Grading Final MHERNANDEZ Approved Entered by VVERA1 - INSPECTION 09185 GRADING - INTERMEDIATE APPROVED
06/17/2021 ENGR Grading Final MHERNANDEZ Continued Entered by VLEON1 - CN/ PAVING THE WEST SIDE OF THR BUILDING PARKING LOT.
06/07/2021 ENGR Grading Final MHERNANDEZ Continued Entered by VLEON1 -
04/02/2021 ENGR Grading Final MHERNANDEZ Continued Entered by RSALDAT1 - CN FORMING THE TOP OF THE RCBC .STATION24 15To 25 27 cL. Conversation with Bill from catamount informed him the Catamount need to start schedule inspection for them self. The side walk scupper that was poured need to have the engineer of record sign off on them.
04/01/2021 ENGR Grading Final MHERNANDEZ Continued Entered by VLEON1 - CONTINUE NO ACTIVITY ON THE CHANNEL
03/31/2021 ENGR Grading Final MHERNANDEZ Continued Entered by RSALDAT1 - cn
03/30/2021 ENGR Grading Final MHERNANDEZ Continued Entered by VLEON1 - CHECK ON THE REQUIREMENTS FOR INSPECTIONS AFTER THIS WEEK POURING THE RCBC TOMORROW
03/25/2021 ENGR Grading Final MHERNANDEZ Continued Entered by VLEON1 - SHOTCRETE THE WALLS FOR THE CHANNEL LEFT SIDE .FORMING THE WALL FOR THE RCBC STATION 24 15 to 25 27 LC. SHOTCRETE STATION 20 05 LT. To 19 70 LT.. No inspection yesterday.
03/23/2021 ENGR Grading Final MHERNANDEZ Continued Entered by RSALDAT1 - CN PLACEMENT OF SHOTCRETE ON THE LT. SIDE OF THE CHANNEL STATION 23 40 LT. TO 21 25 LT. 150 LF.
03/22/2021 ENGR Grading Final MHERNANDEZ Continued Entered by VLEON1 - CONTINUE - EXCAVATING FOR THE TOE ON THE LEFT SIDE OF THE CHANNEL WALL. POURING THE FLOOR FOR THE TWO CELL RCBS STATION 24 15 TO 25 27 CL. POURED THE RCBS AT STATION 15 00 TO 15 77 CL.
03/22/2021 ENGR Grading Final MHERNANDEZ Continued Entered by VLEON1 - CONTINUE. EXCAVATING FOR THE TOE ON THE LEFT SIDE OF THE CHANNEL WALL. POURING THE FLOOR FOR THE TWO CELL RCBC STATION 24 15 to 25 27 CL.
03/19/2021 ENGR Grading Final DROBERTS Continued Entered by VLEON1 - CONTINUED, CREWS HAVE COMPLETED THE SOUTH SIDE OF THE GUNITE CHANNEL UP TO APPROXIMATELY STATION 14 50, 50 FEET EAST OF THE WESTERN BOX CULVERT. ALSO THEY CONTINUE TO THE PLACEMENT OF ABC FOR THE SOUTHERN PARKING LOT SOUTH OF THE GUNITE DRAINAGE CHANNEL. THIS WILL CONTINUE NEXT WEEK, ONCE IT IS DONE THEY WILL CONSTRUCT THE PARKING LOT.
03/18/2021 ENGR Grading Final MHERNANDEZ Continued Entered by VLEON1 - CN. POURING SHOTCRETE FROM STATION 18 45 RT TO 16 00 RT. 245 LF. Channel
03/17/2021 ENGR Grading Final MHERNANDEZ Continued Entered by RSALDAT1 - CN. POURING SHOTCRETE FEOM STATION 20 25 RT. to18 45 RT. 180 LF.
03/16/2021 ENGR Grading Final MHERNANDEZ Continued Entered by VLEON1 - CONTINUE NOT POURING SHOTCRETE TODAY, RAIN DAY
03/15/2021 ENGR Grading Final MHERNANDEZ Continued Entered by VLEON1 - CN POURED 165 LF. OF SHOTCRETE ON THE CHANNEL ON FRIDAY STATION 23 40 RT.. To 21 75 RT. TODAY POURING SHOTCRETE FROM STATION 21 75 RT. TO 20 25 RT. 150 LF.
03/12/2021 ENGR Grading Final DROBERTS Continued Entered by RSALDAT1 - CONTINUED AT THIS TIME. THE CONCRETE CREW IS WORKING ON THE PLACEMENT OF GUNITE FOR THE DRAINAGE CHANNEL ON THE SOUTH SIDE. THEY STARTED APPROXIMATELY 50 FEET WEST OF THE EASTERN BOX CHANNEL AND COMPLETED APPROXIMATELY 160 FEET ON GUNITE ON THE SOUTH WALL.
03/11/2021 ENGR Grading Final MHERNANDEZ Continued Entered by VLEON1 - CONTINUE - WILL BE POURING THE WALLS FOR THE CHANNEL . NEED TO MAINTENANCE THE CONCRETE WASHOUT AREA.
03/10/2021 ENGR Grading Final MHERNANDEZ Continued Entered by VLEON1 -
03/09/2021 ENGR Grading Final MHERNANDEZ Continued Entered by VLEON1 -
03/02/2021 ENGR Grading Final DROBERTS Continued Entered by VLEON1 - CONTINUED AT THIS TIME. THE CREWS ARE WORKING ON THE PARKING LOT LOCATED AT THE SOUTHEAST CORNER OF THE SITE, THE SOUTHERN BASINS AND DRAINAGE CHANNELS AND GENERAL SITE PREP ALONG ALVERNON ROAD IN THE RUGHT OF WAY.
10/22/2021 ENGR Grading Final DROBERTS Approved Entered by DROBERT5 -
10/22/2021 ENGR Grading Final DROBERTS Approved Entered by DROBERT5 -
10/22/2021 ENGR Grading Final DROBERTS Approved Entered by DROBERT5 -
05/05/2021 ENGR Grading Final MHERNANDEZ Continued Entered by VLEON1 - CONTINUE - REBAR FOR SCUPPERS