Permit: DP20-0193
Permit Details
Apply Date:
09/25/2020
Applicant:
Kyle Shepherd
Description:
GRADING/SWPPP - La Estancia, Phase 2, Parcel 3.
Permit Reviews
Permit Number - DP20-0193
Permit Status: Issued
Permit Description: GRADING/SWPPP - La Estancia, Phase 2, Parcel 3.
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
08/27/2020 | DEV PKG - OK TO SUBMIT (GRADING ONLY) | 09/28/2020 | COMPLETED |
09/28/2020 | GRADING | 11/25/2020 | COMPLETED |
12/10/2020 | GRADING | 01/26/2021 | COMPLETED |
Outstanding Activity Conditions
Permit Number - DP20-0193
Permit Status: Issued
Permit Description: GRADING/SWPPP - La Estancia, Phase 2, Parcel 3.
Total Outstanding Activity Conditions - 2
Date | Name |
---|---|
07/14/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. |
07/14/2023 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
Outstanding Inspections
Permit Status: Issued
Permit Number: DP20-0193
Permite Description: GRADING/SWPPP - La Estancia, Phase 2, Parcel 3.
Total Outstanding Inspections - 6
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/01/2023 | SITE - Stormwater Setup and Controls | N/A | Complete (Recurring) | multiple areas need wattle adjusted and staked off. |
10/27/2023 | SITE - Stormwater Final Inspection | N/A | Not Ready | Ensure that all work is completed per the approved plans, and provide this department with the NOT Notice of Termination from the Arizona Department of Environment Quality for this Permit. What’s this information has been pre-AA inspection for this can be done and this portion of the permit can be approved. |
09/29/2023 | PDSD Site/Engineering Division - NPPO | N/A | Not Ready | Complete all the work on this site as shown on the approved plans prior to calling in this inspection for a final |
10/27/2023 | ENGR Grading Final | N/A | Not Ready | Complete this site as shown on the approved plans prior to calling this Inspection in again for another Grading Inspection. |
04/25/2024 | PDSD Site/Engineering Division - Landscaping | N/A | Partial Pass | Partial inspection, I need to complete the landscaping per plan. Replace all dead plants and remove debris from basins. |
01/05/2024 | SITE - Stormwater Follow-up | N/A | Complete (Recurring) | Minor cleanup of the sites under construction at this time, general clean of the streets and the basins will be required before the final approval once all work has been completed per the Approved plans. |
Completed Inspections
Permit Status: Issued
Permit Number: DP20-0193
Permit Description: GRADING/SWPPP - La Estancia, Phase 2, Parcel 3.
Total Completed Inspections - 4
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/19/2021 | PDSD Engineering Division Pre-Construction SITE | Passed | {Activity date: 03/19/2021; Status: Approved; Inspector: DROBERTS; Comment: Entered by VLEON1 - } | |
09/29/2023 | SITE - Stormwater Setup and Controls | Passed | ||
10/27/2023 | COT - ENGR - Signage Final | Passed | ||
10/27/2023 | ENGR Engineering Final | Passed |