Permit: DP20-0193

Parcel: 141366880

Inspection Status: Not Ready

Inspection History: SITE - Stormwater Setup and Controls

Permit Number - DP20-0193

Inspection Description - SITE - Stormwater Setup and Controls

Inspection Status - Not Ready

Date Description Inspector Results Comments
10/26/2022 SITE - Stormwater Setup and Controls Not Ready
04/16/2021 SITE - Stormwater Setup and Controls DROBERTS Partial Approval Entered by RSALDAT1 - PARTIAL
03/19/2021 SITE - Stormwater Setup and Controls DROBERTS Partial Approval Entered by VLEON1 - PARTIAL AT THIS TIME, TRACK OUT ROCK HAS BEEN INSTALLED AS NEEDED
01/20/2023 SITE - Stormwater Setup and Controls Complete (Recurring) Complete all work on this side is showing on the approved plans prior to calling in for a final
02/06/2023 SITE - Stormwater Setup and Controls Complete (Recurring) No concerns at this time
05/01/2023 SITE - Stormwater Setup and Controls Complete (Recurring)
06/23/2023 SITE - Stormwater Setup and Controls Complete (Recurring) No concerns at this time. Continue doing what you’re doing.
08/04/2023 SITE - Stormwater Setup and Controls Partial Pass Stormwater setup and controls are in place and a few areas on site have slight runoff.
09/01/2023 SITE - Stormwater Setup and Controls Complete (Recurring) multiple areas need wattle adjusted and staked off.
09/29/2023 SITE - Stormwater Setup and Controls Passed