Permit: DP20-0192
Permit Details
Apply Date:
09/23/2020
Applicant:
Description:
SITE - Tucson Old Pueblo Credit Union, solar on ground-set canopy.
Permit Reviews
Permit Number - DP20-0192
Permit Status: Complete
Permit Description: SITE - Tucson Old Pueblo Credit Union, solar on ground-set canopy.
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
09/25/2020 | DEV PKG - OK TO SUBMIT | 09/28/2020 | COMPLETED |
09/28/2020 | DEV PKG | 10/27/2020 | COMPLETED |
Outstanding Inspections
Permit Status: Complete
Permit Number: DP20-0192
Permite Description: SITE - Tucson Old Pueblo Credit Union, solar on ground-set canopy.
Total Outstanding Inspections - 1
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/22/2021 | SITE - Stormwater Setup and Controls | N/A | Partial Pass | {Activity date: 01/22/2021; Status: Approved; Inspector: BBENEDON; Comment: Entered by VLEON1 - APPROVED} ; {Activity date: 01/22/2021; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by VLEON1 - Partially approved. Waddles have been installed to contain materials on site.} |
Completed Inspections
Permit Status: Complete
Permit Number: DP20-0192
Permit Description: SITE - Tucson Old Pueblo Credit Union, solar on ground-set canopy.
Total Completed Inspections - 8
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/22/2021 | PDSD Engineering Division Pre-Construction SITE | Passed | {Activity date: 01/22/2021; Status: Approved; Inspector: BBENEDON; Comment: Entered by VLEON1 - Approved. Stephan from technicians for sustainability. Small solar array located in Desert north west of building.} | |
03/10/2021 | PDSD Site/Engineering Division - Landscaping | Passed | {Activity date: 03/10/2021; Status: Approved; Inspector: BBENEDON; Comment: Entered by VLEON1 - } | |
03/10/2021 | PDSD Site/Engineering Division - NPPO | Passed | {Activity date: 03/10/2021; Status: Approved; Inspector: BBENEDON; Comment: Entered by VLEON1 - } ; {Activity date: 01/22/2021; Status: Partial Approval; Inspector: BBENEDON; Comment: Entered by VLEON1 - Partially approved. Native plants have been relocated as specified.} | |
03/10/2021 | ENGR Engineering Final | Passed | {Activity date: 03/10/2021; Status: Approved; Inspector: BBENEDON; Comment: Entered by VLEON1 - } | |
03/10/2021 | SITE - Stormwater Follow-up | Passed | {Activity date: 03/10/2021; Status: Approved; Inspector: BBENEDON; Comment: Entered by VLEON1 - } ; {Activity date: 01/28/2021; Status: Continued; Inspector: BBENEDON; Comment: Entered by VLEON1 - CONTINUE THERE ARE NO ISSUES AFTER LAST RAIN EVENT} | |
03/10/2021 | SITE - Stormwater Final Inspection | Passed | {Activity date: 03/10/2021; Status: Approved; Inspector: BBENEDON; Comment: Entered by VLEON1 - } | |
03/10/2021 | COT - ENGR - Signage Final | Passed | {Activity date: 03/10/2021; Status: Approved; Inspector: BBENEDON; Comment: Entered by VLEON1 - } ; {Activity date: 03/09/2021; Status: Cancelled; Inspector: IVR USER; Comment: Entered by IVR USER - IVRS - AP canceled} ; {Activity date: 01/28/2021; Status: Not Applicable; Inspector: BBENEDON; Comment: Entered by VLEON1 - NOT APPLICABLE} | |
08/02/2022 | ENGR Grading Final | Passed | {Activity date: 08/02/2022; Status: Approved; Inspector: Sharon B.; Comment: Entered by SBEASLE1 - Approved per email from Brian Benedon to David Roberts and Sharon Beasley, 08/02/22: "Yes, Approved, thank you!"} ; {Activity date: 08/20/2021; Status: Continued; Inspector: BBENEDON; Comment: Entered by NGARCIA3 - Continued. No activity on site at this time} ; {Activity date: 01/22/2021; Status: Cancelled; Inspector: BBENEDON; Comment: Entered by VLEON1 - Continued. Project is underway at this time. A portion of the desert slightly larger than the size of the array has been graded. Cactus has been relocated as specified. Controls are in place. Construction of the solar array is in progress.} |