Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit: DP20-0192

Parcel: 13336014G


Addresses:

9725 E BROADWAY BL


Inspection Status: Passed

Inspection History: ENGR Grading Final

Permit Number - DP20-0192

Inspection Description - ENGR Grading Final

Inspection Status - Passed

Date Description Inspector Results Comments
03/10/2021 ENGR Grading Final BBENEDON Approved Entered by VLEON1 -
03/10/2021 ENGR Grading Final BBENEDON Approved Entered by VLEON1 -
01/28/2021 ENGR Grading Final BBENEDON Continued Entered by VLEON1 - CONTINUE FOOTINGS INSTALLED FOR SOLAR ARRAY. STEPHAN WITH TF'S
08/02/2022 ENGR Grading Final Sharon B. Approved Entered by SBEASLE1 - Approved per email from Brian Benedon to David Roberts and Sharon Beasley, 08/02/22: "Yes, Approved, thank you!"
08/20/2021 ENGR Grading Final BBENEDON Continued Entered by NGARCIA3 - Continued. No activity on site at this time
01/22/2021 ENGR Grading Final BBENEDON Cancelled Entered by VLEON1 - Continued. Project is underway at this time. A portion of the desert slightly larger than the size of the array has been graded. Cactus has been relocated as specified. Controls are in place. Construction of the solar array is in progress.