Permit: DP20-0186
Permit Details
Apply Date:
09/17/2020
Applicant:
Lisa Bowers
Description:
Site/Grading/SWPPP - Daybreak Distribution Center.
Permit Reviews
Permit Number - DP20-0186
Permit Status: Complete
Permit Description: Site/Grading/SWPPP - Daybreak Distribution Center.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/12/2021 | DEV PKG - RESUBMITTAL | 02/19/2021 | COMPLETED |
| 09/17/2020 | DEV PKG - OK TO SUBMIT | 09/28/2020 | COMPLETED |
| 09/28/2020 | DEV PKG | 11/23/2020 | COMPLETED |
| 12/15/2020 | DEV PKG - RESUBMITTAL | 02/12/2021 | COMPLETED |
Completed Inspections
Permit Status: Complete
Permit Number: DP20-0186
Permit Description: Site/Grading/SWPPP - Daybreak Distribution Center.
Total Completed Inspections - 9
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/25/2022 | PDSD Site/Engineering Division - NPPO | Passed | {Activity date: 02/25/2022; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } | |
| 02/25/2022 | SITE - Stormwater Setup and Controls | Passed | {Activity date: 02/25/2022; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } | |
| 02/25/2022 | PDSD Engineering Division Pre-Construction SITE | Passed | {Activity date: 02/25/2022; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 02/25/2021; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by RSALDAT1 - S PARTIAL AT THIS TIME. I MET WITH THE DEVELOPER/CONTRACTR ND DISCUSSED IN DETAIL WHAT WILL BE HAPENNG ON THIS SITE AND OUR CONCERNS.THEY WILL BE CALLING THI INSPECTION IN AGAIN TO MEET WITH US ONCE THEY ARE BEGINNING TO START THE WORK.} | |
| 02/25/2022 | COT - ENGR - Signage Final | Passed | {Activity date: 02/25/2022; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } | |
| 04/06/2022 | PDSD Site/Engineering Division - Landscaping | Passed | {Activity date: 04/06/2022; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 03/09/2022; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by NGARCIA3 - CN /PLANTING THE TREES AND SHRUBS.} ; {Activity date: 02/25/2022; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 02/23/2022; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by NGARCIA3 - CN INSTALLING IRRIGATION LINES.AROUND THE BUILDING.} | |
| 04/06/2022 | ENGR Engineering Final | Passed | {Activity date: 04/06/2022; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 03/03/2022; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by NGARCIA3 - CN /THE GRADING I FOR LANDSCAPING.NO CONCERN AT IS TIME. } ; {Activity date: 01/11/2022; Status: Partial Approval; Inspector: MHHERNANDEZ; Comment: Entered by VVERA1 - PARTIAL /CONTINUE TO GRADE THE WEST PARKING LOT. } |
|
| 04/06/2022 | SITE - Stormwater Follow-up | Passed | {Activity date: 04/06/2022; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 03/29/2022; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by NGARCIA3 - PARTIAL, NO CONCERNS AT THIS TIME.} ; {Activity date: 03/09/2022; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by NGARCIA3 - CN} ; {Activity date: 11/05/2021; Status: Continued; Inspector: DROBERTS; Comment: Entered by RSALDAT1 - CONTINUED AT THIS TIME, NO CONCERNS NOTED DURING THIS INSPECTION. 9185 (GRADING - INTERMEDIATE) WORK MAINLY GOING VERTICAL ON THIS SITE, CREWS ALSO WORKING ON GRADING OF THE SITE ON THE WEST SIDE OF THE BUILDING. ALSO CREWS HAVE BEEN PLACING THE CONCRETE PAVEMENT AROUND THE SITE. THEY HAVE PLACED APPROXIMATELY 50% OF THE WHITE PAVEMENT ON THE NORTH-SIDE TODAY.} ; {Activity date: 09/30/2021; Status: Continued; Inspector: DROBERTS; Comment: Entered by VVERA1 - FOLLOWUP IS CONTINUED NO CONCERNS AT THIS TIME,} ; {Activity date: 09/01/2021; Status: Continued; Inspector: MERNANDEZ; Comment: Entered by VVERA1 - 9154 (STORMWATER FOLLOW-UP INSP) CN/ GOOD AT IS TIME.} ; {Activity date: 08/24/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by VVERA1 - CN/ BACKFILLING THE STORM DRAIN WEST OF THE BUILDING. } ; {Activity date: 06/15/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by VLEON1 - } ; {Activity date: 03/22/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by VLEON1 - } ; {Activity date: 03/18/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by VLEON1 - } ; {Activity date: 03/12/2021; Status: Continued; Inspector: DROBERTS; Comment: Entered by RSALDAT1 - CONTINUED, NO CONCERNS NOTED DURING THIS INSPECTION. } ; {Activity date: 03/11/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by VLEON1 - } ; {Activity date: 03/10/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by VLEON1 - } |
|
| 04/06/2022 | ENGR Grading Final | Passed | {Activity date: 04/06/2022; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 03/29/2022; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by NGARCIA3 - PARTIAL AT THIS TIME, LANDSCAPING, ROCK RIP RAP, AND DECOMPOSED GRANITE IS BEING PLACED AT THIS TIME. THIS SITE WILL BE RESCHEDULED FOR FRIDAY OF THIS WEEK TO SEE HOW MUCH WORK IS NEEDED TO COMPLETE THIS SITE. } ; {Activity date: 03/16/2022; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by VVERA1 - INTERMEDIATE CREWS LOOKING FOR ALL REMAINING ITEMS PUNCHLIST CN /. NEED TO FINISH THE LANDSCAPE AND THE IRRIGATION SYSTEM.WHICH INCLUDES THE RIP RAP IN THE BASIN.AND PLANTING THE SHRIBS. } ; {Activity date: 02/25/2022; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 12/03/2021; Status: Continued; Inspector: DROBERTS; Comment: Entered by RSALDAT1 - CONTINUED, THE CREWS ARE WOKING ON FINISH GRADING ALL THE EXTERIOR AREAS ON THE EAST SIDE OF THE PROJECT AND IN THE RIGHT OF WAY ALONG TUCSON BLVD. ON THE WEST SIDE OF THE PROJECT CREWS ARE WORKING ON POURING THE WHITE PAVEMENT WEST OF THE BUILDING AND GRADING AREAS FOR FUTURE PAVEMENT AND LANDSCAPING.} ; {Activity date: 10/28/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by VVERA1 - CN /POURED SOME CURB ON THE SOUTH END OF BUILDING.} ; {Activity date: 09/30/2021; Status: Continued; Inspector: DROBERTS; Comment: Entered by VVERA1 - INTERMEDIATE IS CONTINUED, CREWS WORKING MAINLY ON THE STRUCTURE. I MET WITH THE GENERAL CONTRACTOR AND HIS SUBCONTRACTOR ABOUT THE TRASH ENCLOSURE THAT THEY WILL START WORKING ON THIS WEEK. I HAVE REMINDED THEM TO UTILIZE THE DETAILS THAT WE HAVE PROVIDED FO THEM AND TO SCHEDULE AN INSPECTION ONCE THEY HAVE THE REBAR PLACED READY TO POUR.} ; {Activity date: 06/15/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by VLEON1 - } ; {Activity date: 03/22/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by VLEON1 - } ; {Activity date: 03/12/2021; Status: Continued; Inspector: DROBERTS; Comment: Entered by RSALDAT1 - CONTINUED AT THIS TIME, CREWS CONTINUE TO WORK ON THE SUB-GRADE FOR THE SITE.} ; {Activity date: 03/11/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by VLEON1 - } ; {Activity date: 03/10/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by VLEON1 - } |
|
| 04/06/2022 | SITE - Stormwater Final Inspection | Passed | {Activity date: 04/06/2022; Status: Approved; Inspector: MHERNANDEZ; Comment: Entered by VVERA1 - APPROVED} |