Permit: DP20-0186

Parcel: 14028022F


Addresses:

6360 S TUCSON BL

Inspection Status: Passed

Inspection History: ENGR Grading Final

Date Description Inspector Results Comments
02/25/2022 ENGR Grading Final DROBERTS Approved Entered by DROBERT5 -
02/25/2022 ENGR Grading Final DROBERTS Approved Entered by DROBERT5 -
02/25/2022 ENGR Grading Final DROBERTS Approved Entered by DROBERT5 -
12/13/2021 ENGR Grading Final MHERNANDEZ Continued Entered by NGARCIA3 - CN /REBAR INSPECTION FOR TRASH BIN FLOOR GOOD .
12/10/2021 ENGR Grading Final DROBERTS Continued Entered by RSALDAT1 - CONTINUED, OK TO POUR THE FLOOR SLAB AND APPROACH FOR THE TRASH ENCLOSURE LOCATED AT THE SOUTH WEST CORNER OF THE SITE PENDING ADDING ADDITIONAL SPACERS UNDER NEATH THE REBAR MAT. PROVIDE PHOTO OF THE ADDITIONAL SPACERS PRIOR TO THE PLACEMENT OF THE CONCRETE.
11/15/2021 ENGR Grading Final MHERNANDEZ Continued Entered by VVERA1 - CN /REBAR FOR THE WALLS .TRASH BIN.
11/10/2021 ENGR Grading Final MHERNANDEZ Continued Entered by VVERA1 - CN/ TRASH BIN FOOTER.
11/09/2021 ENGR Grading Final MHERNANDEZ Continued Entered by NGARCIA3 - CN /POURED THE FRONT OF THE BUILDING DRIVEWAY 4” WAS NOT INSPECTED .NEED THE ENGINEER TO SIGN OFF ON IT
04/06/2022 ENGR Grading Final DROBERTS Approved Entered by DROBERT5 -
03/29/2022 ENGR Grading Final DROBERTS Partial Approval Entered by NGARCIA3 - PARTIAL AT THIS TIME, LANDSCAPING, ROCK RIP RAP, AND DECOMPOSED GRANITE IS BEING PLACED AT THIS TIME. THIS SITE WILL BE RESCHEDULED FOR FRIDAY OF THIS WEEK TO SEE HOW MUCH WORK IS NEEDED TO COMPLETE THIS SITE.
03/16/2022 ENGR Grading Final MHERNANDEZ Continued Entered by VVERA1 - INTERMEDIATE CREWS LOOKING FOR ALL REMAINING ITEMS PUNCHLIST CN /. NEED TO FINISH THE LANDSCAPE AND THE IRRIGATION SYSTEM.WHICH INCLUDES THE RIP RAP IN THE BASIN.AND PLANTING THE SHRIBS.
02/25/2022 ENGR Grading Final DROBERTS Approved Entered by DROBERT5 -
12/03/2021 ENGR Grading Final DROBERTS Continued Entered by RSALDAT1 - CONTINUED, THE CREWS ARE WOKING ON FINISH GRADING ALL THE EXTERIOR AREAS ON THE EAST SIDE OF THE PROJECT AND IN THE RIGHT OF WAY ALONG TUCSON BLVD. ON THE WEST SIDE OF THE PROJECT CREWS ARE WORKING ON POURING THE WHITE PAVEMENT WEST OF THE BUILDING AND GRADING AREAS FOR FUTURE PAVEMENT AND LANDSCAPING.
10/28/2021 ENGR Grading Final MHERNANDEZ Continued Entered by VVERA1 - CN /POURED SOME CURB ON THE SOUTH END OF BUILDING.
09/30/2021 ENGR Grading Final DROBERTS Continued Entered by VVERA1 - INTERMEDIATE IS CONTINUED, CREWS WORKING MAINLY ON THE STRUCTURE. I MET WITH THE GENERAL CONTRACTOR AND HIS SUBCONTRACTOR ABOUT THE TRASH ENCLOSURE THAT THEY WILL START WORKING ON THIS WEEK. I HAVE REMINDED THEM TO UTILIZE THE DETAILS THAT WE HAVE PROVIDED FO THEM AND TO SCHEDULE AN INSPECTION ONCE THEY HAVE THE REBAR PLACED READY TO POUR.
06/15/2021 ENGR Grading Final MHERNANDEZ Continued Entered by VLEON1 -
03/22/2021 ENGR Grading Final MHERNANDEZ Continued Entered by VLEON1 -
03/12/2021 ENGR Grading Final DROBERTS Continued Entered by RSALDAT1 - CONTINUED AT THIS TIME, CREWS CONTINUE TO WORK ON THE SUB-GRADE FOR THE SITE.
03/11/2021 ENGR Grading Final MHERNANDEZ Continued Entered by VLEON1 -
03/10/2021 ENGR Grading Final MHERNANDEZ Continued Entered by VLEON1 -