Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Issued
Type:
Development Package
Address NEW:
3581 N CALLE ROSARIO
Apply Date:
07/20/2020
Applicant:
Description:
GRADING - Rio Verde Vista, Lot one, rough grading.

Permit Reviews

Permit Number - DP20-0145
Permit Status: Issued
Permit Description: GRADING - Rio Verde Vista, Lot one, rough grading.
Start Date Submittal Complete Date Status  
07/20/2020 DEV PKG - OK TO SUBMIT (GRADING ONLY) 07/21/2020 COMPLETED Review Details
07/21/2020 GRADING 08/14/2020 COMPLETED Review Details
08/17/2020 GRADING 08/27/2020 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - DP20-0145
Permit Status: Issued
Permit Description: GRADING - Rio Verde Vista, Lot one, rough grading.
Total Outstanding Activity Conditions - 1
Date Name
07/20/2020 1. The limits of fill and limits of grading shall be clearly staked before any fill is placed on the site.2. Upon completion, the Engineer-of-Record shall certify the filled area has been stabilized to prevent wind or rain erosion.

Outstanding Inspections

Permit Status: Issued
Permit Number: DP20-0145
Permite Description: GRADING - Rio Verde Vista, Lot one, rough grading.
Total Outstanding Inspections - 6
Last Inspection Date Description Inspector Results Comments
10/27/2022 PDSD Site/Engineering Division - Landscaping N/A Not Ready
10/26/2022 PDSD Site/Engineering Division - NPPO N/A Not Ready
10/27/2022 ENGR Engineering Final N/A Not Ready
10/26/2022 SITE - Stormwater Final Inspection N/A Not Ready
10/26/2022 PDSD Engineering Division Pre-Construction SITE N/A Not Ready
11/30/2023 COT - ENGR - Signage Final N/A Not Applicable spoke with Marty Magelli with Baker & Associates 520-318-1950. the project was for temporary stockpile storage and no further use is intended.

Completed Inspections

Permit Status: Issued
Permit Number: DP20-0145
Permit Description: GRADING - Rio Verde Vista, Lot one, rough grading.
Total Completed Inspections - 4
Date Description Inspector Results Comments
11/30/2023 SITE - Stormwater Follow-up Passed spoke with Marty Magelli with Baker & Associates 520-318-1950. the project was for temporary stockpile storage and no further use is intended.
11/30/2023 ENGR Grading Final Passed spoke with Marty Magelli with Baker & Associates 520-318-1950. the project was for temporary stockpile storage and no further use is intended.
11/30/2023 SITE - Stormwater Setup and Controls Passed spoke with Marty Magelli with Baker & Associates 520-318-1950. the project was for temporary stockpile storage and no further use is intended.
11/30/2023 PDSD Engineering Division Pre-Construction SITE Passed spoke with Marty Magelli with Baker & Associates 520-318-1950. the project was for temporary stockpile storage and no further use is intended.

Documents

File Name Document Type  
CONTRACTOR LETTER.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
1-1 OF 1.PDF DEVELOPMENT PACKAGE VIEW
COMMENT RESPONSE EMAIL, 08.17.20.PDF DOCUMENTS VIEW
NPP PLAN 8-17-2020.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW