Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR Grading Final
Permit Number - DP20-0145
Inspection Description - ENGR Grading Final
Inspection Status - Not Ready
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/27/2022 | ENGR Grading Final | Not Ready | ||
| 10/27/2022 | ENGR Grading Final | Not Ready | ||
| 10/27/2022 | ENGR Grading Final | Not Ready | ||
| 12/16/2021 | ENGR Grading Final | BBENEDON | Continued | Entered by VVERA1 - Continued. Expired permit for rough grading Rio Verde Apartments. Project appears to have been completed |
| 09/21/2021 | ENGR Grading Final | BBENEDON | Continued | Entered by NGARCIA3 - Continued. Expired permit corrections required |
| 09/03/2021 | ENGR Grading Final | BBENEDON | Continued | Entered by VVERA1 - 09183. Continued. Correction required. See notes from 8 5 20 |
| 08/05/2020 | ENGR Grading Final | DROBERTS | Correction Required | Entered by RSALDAT1 - IS CORRECTIONS REQUIRED AT THIS TIME. THIS PERMIT HAS NOT BEEN ISSUED BUT THE WORK HAS BEEN ON GOING. I HAVE CONTACTED THE ENGINEER OF RECORD AND ASKED THAT THIS SITE BE RE-EVALUATED FOR THE FOLLOWING REASONS: 1) THE STOCKPILE IS BEING PLACED IN AN AREA WHERE THE ROADWAY HAS BEEN DEPRESSED TO HELP CREATE A NATURAL DRAINAGE AREA, POSSIBLY TOTALLY BLOCKING THIS SURFACE DRAINAGE OF THE SURROUNDING AREAS. 2) THE DRAINAGE PIPE THAT HAS BEEN PROVIDED TO ASSIST IS AN 18 INCH DRISCOLL LINE THAT IS A FLEXIBLE RUBBER WITH A 1 INCH THICKNESS. THIS PIPE IS NORMALLY USED IN THE CHANNELIZED MOVEMENT OF AT GRADE SURFACE WATER, NOT IN A TRENCHED CONDITION. 3) MINOR AMOUNTS OF EROSION HAS BEEN NOTED DOWN STREAM FROM THE PAST RAINS, THIS WILL BE CHECKED AT A LATER DATE. 4) THE NPPO OF THIS SITE HAS NOT BEEN VERIFIED BY THIS DEPARTMENT SINCE THE PERMIT HAS NOT BEEN ISSUED. VERIFICATION OF ALL PLANTS WITHIN THE STOCKPILE NEEDS TO BE DONE PRIOR TO THE ISSUANCE OF THIS PERMIT. THIS PERMIT NEEDS TO HAVE A PRECON MEETING TO ENSURE THAT ALL OF THE REQUIREMENT ARE BEING MET. CURRENTLY THERE APPEARS TO BE ONE POSSIBLE SAGUARO CACTUS LOCATED AT THE SOUTH WEST CORNER OF THE STOCKPILE AREA THAT IS AT THE EDGE OF THE NEWLY PLACED FILL MATERIAL. THIS NEEDS TO BE VERIFIED ON THE NPPO PLAN AND EITHER PROTECTED OR TRANSPLANTED ON SITE TO PREVENT IT FROM BEING DESTROYED. |
| 11/30/2023 | ENGR Grading Final | Passed | spoke with Marty Magelli with Baker & Associates 520-318-1950. the project was for temporary stockpile storage and no further use is intended. | |
| 11/30/2023 | ENGR Grading Final | Passed | spoke with Marty Magelli with Baker & Associates 520-318-1950. the project was for temporary stockpile storage and no further use is intended. | |
| 11/30/2023 | ENGR Grading Final | Passed | spoke with Marty Magelli with Baker & Associates 520-318-1950. the project was for temporary stockpile storage and no further use is intended. |