Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Development Package
Address:
180 S CHURCH AV
Apply Date:
06/23/2020
Applicant:
Lisa Bowers
Description:
SITE - Tucson Convention Center, Historic Plaza, Phase One.

Permit Reviews

Permit Number - DP20-0129
Permit Status: Complete
Permit Description: SITE - Tucson Convention Center, Historic Plaza, Phase One.
Start Date Submittal Complete Date Status  
05/26/2020 DEV PKG - OK TO SUBMIT 06/26/2020 COMPLETED Review Details
06/26/2020 DEV PKG 08/04/2020 COMPLETED Review Details
08/31/2020 DEV PKG - RESUBMITTAL 10/12/2020 COMPLETED Review Details
11/10/2020 DEV PKG - RESUBMITTAL 12/03/2020 COMPLETED Review Details

Completed Inspections

Permit Status: Complete
Permit Number: DP20-0129
Permit Description: SITE - Tucson Convention Center, Historic Plaza, Phase One.
Total Completed Inspections - 9
Date Description Inspector Results Comments
12/08/2020 SITE - Stormwater Setup and Controls Passed {Activity date: 12/08/2020; Status: Approved; Inspector: DROBERTS; Comment: Entered by PAHUMAD1 - }
12/08/2020 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 12/08/2020; Status: Approved; Inspector: DROBERTS; Comment: Entered by PAHUMAD1 - }
12/22/2020 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 12/22/2020; Status: Approved; Inspector: DROBERTS; Comment: Entered by RSALDAT1 - IS APPROVED}
12/22/2020 PDSD Site/Engineering Division - NPPO Passed {Activity date: 12/22/2020; Status: Approved; Inspector: DROBERTS; Comment: Entered by RSALDAT1 - IS APPROVED}
12/22/2020 SITE - Stormwater Follow-up Passed {Activity date: 12/22/2020; Status: Approved; Inspector: DROBERTS; Comment: Entered by RSALDAT1 - IS APPROVED}
12/22/2020 COT - ENGR - Signage Final Passed {Activity date: 12/22/2020; Status: Approved; Inspector: DROBERTS; Comment: Entered by RSALDAT1 - IS APPROVED}
01/22/2021 ENGR Engineering Final Passed {Activity date: 01/22/2021; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - NORTHERN PORTION TO BE COMPLETED IN PHASE 2} ; {Activity date: 01/19/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by VLEON1 - } ; {Activity date: 12/22/2020; Status: Not ready for Inspection; Inspector: DROBERTS; Comment: Entered by RSALDAT1 - IS NOT READY AT THIS TIME. COMPLETE ALL WORK AS SHOWN ON THE APPROVED PLANS, PROVIDE US WITH AN APPROVED REVISED DRAWING FOR ALL CHANGES THAT HAVE BEEN MADE TO THIS SITE.}
01/22/2021 ENGR Grading Final Passed {Activity date: 01/22/2021; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
01/22/2021 SITE - Stormwater Final Inspection Passed {Activity date: 01/22/2021; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 01/19/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by VLEON1 - } ; {Activity date: 12/22/2020; Status: Not ready for Inspection; Inspector: DROBERTS; Comment: Entered by RSALDAT1 - IS NOT READY AT THIS TIME, PROVIDE THE CLOSEOUT DOCUMENTATION (APPROVED REVISED DRAWINGS, COPY OF THE NOT FROM THE ARIZONA DEPARTMENT OF ENVIRONMENTAL QUALITY}

Documents

File Name Document Type  
CONTRACTOR LETTER DOCUMENTS VIEW
PERMIT DOCUMENTS VIEW
1-24 OF 24.PDF DEVELOPMENT PACKAGE VIEW
COMMENT RESPONSE LETTER, 11.10.20.PDF DOCUMENTS VIEW
APPROVAL LETTERHPZ-20-035DL, HISTORIC PRESERVATION.PDF DOCUMENTS VIEW
COMMENT RESPONSE LTR, 08.31.20.PDF DOCUMENTS VIEW
DP APP.PDF DOCUMENTS VIEW