Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: DP20-0080
Permit Details
Apply Date:
04/13/2020
Applicant:
Thomas Garrett
Description:
SITE/GRADING/SWPPP- Encantada at Saguaro Trails, multi-family residential.
Permit Reviews
Permit Number - DP20-0080
Permit Status: Complete
Permit Description: SITE/GRADING/SWPPP- Encantada at Saguaro Trails, multi-family residential.
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
04/13/2020 | DEV PKG - OK TO SUBMIT | 04/14/2020 | COMPLETED |
04/14/2020 | DEV PKG | 05/12/2020 | COMPLETED |
05/31/2021 | DEV PKG - OK TO SUBMIT | 06/10/2021 | COMPLETED |
06/10/2021 | REVISION - - 2ND | 07/28/2021 | COMPLETED |
06/26/2020 | DEV PKG - RESUBMITTAL | 07/31/2020 | COMPLETED |
08/20/2020 | DEV PKG - RESUBMITTAL | 08/26/2020 | COMPLETED |
09/09/2021 | DEV PKG - OK TO SUBMIT | 10/04/2021 | COMPLETED |
10/04/2021 | REVISION - - 3RD | 10/29/2021 | COMPLETED |
11/30/2020 | DEV PKG - OK TO SUBMIT | 12/17/2020 | COMPLETED |
12/17/2020 | REVISION - - 1ST | 12/22/2020 | COMPLETED |
11/14/2022 | DEVELOPMENT PACKAGE REVIEW v.1 | 11/16/2022 | APPROVED |
Outstanding Activity Conditions
Permit Number - DP20-0080
Permit Status: Complete
Permit Description: SITE/GRADING/SWPPP- Encantada at Saguaro Trails, multi-family residential.
Total Outstanding Activity Conditions - 3
Date | Name |
---|---|
07/20/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. |
07/20/2023 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
08/26/2020 | NUOS area shall be recorded prior to issuance of C of O on building plans. |
Outstanding Inspections
Permit Status: Complete
Permit Number: DP20-0080
Permite Description: SITE/GRADING/SWPPP- Encantada at Saguaro Trails, multi-family residential.
Total Outstanding Inspections - 2
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/21/2022 | PDSD Site/Engineering Division - Landscaping | N/A | Complete (Recurring) | {Activity date: 07/21/2022; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by NGARCIA3 - CN 5750 S HOUGHTON RD} ; {Activity date: 07/21/2022; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by NGARCIA3 - CN 5700 S HOUGHTON RD} ; {Activity date: 07/21/2022; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by NGARCIA3 - CN 10220 E DREXEL RD} ; {Activity date: 07/21/2022; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by NGARCIA3 - CN 10090 E DREXEL RD} ; {Activity date: 03/24/2022; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by NGARCIA3 - CN /STILL NEEDS SOME PLANTS AND SPLASH PAD. 5750 S HOUGHTON RD} ; {Activity date: 03/24/2022; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by NGARCIA3 - CN /STILL NEEDS SOME PLANTS AND SPLASH PAD. 5700 S HOUGHTON RD} ; {Activity date: 03/24/2022; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by NGARCIA3 - CN /STILL NEEDS SOME PLANTS AND SPLASH PAD. 10220 E DREXEL RD} ; {Activity date: 03/24/2022; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by NGARCIA3 - CN /STILL NEEDS SOME PLANTS AND SPLASH PAD. 10090 E DREXEL RD} ; {Activity date: 01/11/2022; Status: Partial Approval; Inspector: MHERNANDEZ; Comment: Entered by RSALDAT1 - PARTIAL /FOR THE OFFICE .NEED TO FINISH PLANTING AND PLACING THE D. G.} ; {Activity date: 01/11/2022; Status: Partial Approval; Inspector: MHERNANDEZ; Comment: Entered by RSALDAT1 - ) PARTIAL /FOR THE OFFICE .NEED TO FINISH PLANTING AND PLACING THE D. G.} ; {Activity date: 01/11/2022; Status: Partial Approval; Inspector: MHERNANDEZ; Comment: Entered by RSALDAT1 - PARTIAL /FOR THE OFFICE .NEED TO FINISH PLANTING AND PLACING THE D. G.} ; {Activity date: 01/11/2022; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by RSALDAT1 - PARTIAL /FOR THE OFFICE .NEED TO FINISH PLANTING AND PLACING THE D. G. } |
07/21/2022 | SITE - Stormwater Follow-up | N/A | Complete (Recurring) | {Activity date: 07/21/2022; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by NGARCIA3 - CN /NO CHANGES 5750 S HOUGHTON RD} ; {Activity date: 07/21/2022; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by NGARCIA3 - CN /NO CHANGES 5700 S HOUGHTON RD} ; {Activity date: 07/21/2022; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by NGARCIA3 - CN /NO CHANGES 10220 E DREXEL RD} ; {Activity date: 07/21/2022; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by NGARCIA3 - CN /NO CHANGES 10090 E DREXEL RD} ; {Activity date: 04/26/2022; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by NGARCIA3 - CN NO CONCERNS AS TODAY 5750 S HOUGHTON RD} ; {Activity date: 04/26/2022; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by NGARCIA3 - CN NO CONCERNS AS TODAY 5700 S HOUGHTON RD} ; {Activity date: 04/26/2022; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by NGARCIA3 - CN NO CONCERNS AS TODAY 10220 E DREXEL RD} ; {Activity date: 04/26/2022; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by NGARCIA3 - CN NO CONCERNS AS TODAY 10090 E DREXEL RD} ; {Activity date: 04/07/2022; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by VVERA1 - CN / GOOD AT IS TIME} ; {Activity date: 02/01/2022; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by RSALDAT1 - CN /} ; {Activity date: 02/01/2022; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by RSALDAT1 - CN /} ; {Activity date: 02/01/2022; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by RSALDAT1 - CN /} ; {Activity date: 02/01/2022; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by RSALDAT1 - ) CN /} ; {Activity date: 01/11/2022; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by RSALDAT1 - CN /GOOD AT IS TIME} ; {Activity date: 01/11/2022; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by RSALDAT1 - CN /GOOD AT IS TIME} ; {Activity date: 01/11/2022; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by RSALDAT1 - CN /GOOD AT IS TIME} ; {Activity date: 01/11/2022; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by RSALDAT1 - CN /GOOD AT IS TIME} ; {Activity date: 12/10/2021; Status: Continued; Inspector: DROBERTS; Comment: Entered by VVERA1 - IS CONTINUED, NO CONCERNS AT THIS TIME, THE CONTRACTOR IS LIMITING WORK TODAY DUE TO THE RAIN CONDITIONS CAUSED LAST NIGHT.} ; {Activity date: 11/22/2021; Status: Continued; Inspector: DROBERTS; Comment: Entered by RSALDAT1 - CONTINUED NO CONCERN AT THIS TIME 9181 (GRADING - REBAR) IS PARTIAL OK TO POUR THE FLOOR AND APPROACH FOR THE TRASH ENCLOSURE} ; {Activity date: 11/22/2021; Status: Continued; Inspector: DROBERTS; Comment: Entered by RSALDAT1 - ONTINUED NO CONCERN AT THIS TIME 9181 (GRADING - REBAR) IS PARTIAL OK TO POUR THE FLOOR AND APPROACH FOR THE TRASH ENCLOSURE} ; {Activity date: 11/22/2021; Status: Continued; Inspector: DROBERTS; Comment: Entered by RSALDAT1 - CONTINUED NO CONCERN AT THIS TIME 9181 (GRADING - REBAR) IS PARTIAL OK TO POUR THE FLOOR AND APPROACH FOR THE TRASH ENCLOSURE} ; {Activity date: 11/19/2021; Status: Continued; Inspector: DROBERTS; Comment: Entered by RSALDAT1 - ONTINUED NO CONCERN AT THIS TIME 9181 (GRADING - REBAR) IS PARTIAL OK TO POUR THE FLOOR AND APPROACH FOR THE TRASH ENCLOSURE} ; {Activity date: 10/07/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by RSALDAT1 - CN / GOOD AT IS TIME.} ; {Activity date: 10/07/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by RSALDAT1 - CN / GOOD AT IS TIME.} ; {Activity date: 10/07/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by RSALDAT1 - ) CN / GOOD AT IS TIME.} ; {Activity date: 10/07/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by RSALDAT1 - CN / GOOD AT IS TIME.} ; {Activity date: 09/27/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by NGARCIA3 - CN /GOOD FOR TODAY 5750 S HOUGHTON RD} ; {Activity date: 09/27/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by NGARCIA3 - CN /GOOD FOR TODAY 5700 S HOUGHTON RD} ; {Activity date: 09/27/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by NGARCIA3 - CN /GOOD FOR TODAY 10220 E DREXEL RD} ; {Activity date: 09/27/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by NGARCIA3 - CN /GOOD FOR TODAY 10090 E DREXEL RD} ; {Activity date: 09/07/2021; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - 09154, 09181. Not ready. No contact information provided} ; {Activity date: 09/07/2021; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - 09154, 09181. Not ready. No contact information provided} ; {Activity date: 09/07/2021; Status: Not ready for Inspection; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - 09154, 09181. Not ready. No contact information provided. No contact information under preconstruction meeting. Please provide contact information when scheduling inspections. Document all work. Reschedule inspection when ready } ; {Activity date: 08/12/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by RSALDAT1 - CN /THE STORMWATER IS FLOWING IS GOOD.} ; {Activity date: 08/12/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by RSALDAT1 - CN /THE STORMWATER IS FLOWING IS GOOD.} ; {Activity date: 08/12/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by RSALDAT1 - CN /STORMWATER DRAINAGE GOOD.} ; {Activity date: 08/12/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by RSALDAT1 - CN /STORMWATER DRAINAGE GOOD. } ; {Activity date: 07/13/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by RSALDAT1 - CN/. CONTINUE WORKING ON THE STORM DRAINAGES } ; {Activity date: 07/13/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by RSALDAT1 - CN/. CONTINUE WORKING ON THE STORM DRAINAGES} ; {Activity date: 07/13/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by RSALDAT1 - CN/. CONTINUE WORKING ON THE STORM DRAINAGES } ; {Activity date: 07/13/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by RSALDAT1 - CN/. CONTINUE WORKING ON THE STORM DRAINAGES } ; {Activity date: 04/29/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by VLEON1 - CONTINUE FOR 10220 E DREXEL RD} ; {Activity date: 04/29/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by VLEON1 - CONTINUE FOR 10090 E DREXEL RD} ; {Activity date: 04/29/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by VLEON1 - CONTINUE TO 5700 S HOUGHTON RD} ; {Activity date: 04/28/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by VLEON1 - CONTINUE FOR 10220 E DREXEL RD} ; {Activity date: 04/14/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by VLEON1 - CONTINUE FOR 5750 S HOUGHTON RD} ; {Activity date: 04/14/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by VLEON1 - CONTINUE FOR 5700 S HOUGHTON RD} ; {Activity date: 04/14/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by VLEON1 - CONTINUE FOR 10220 E DREXEL RD} ; {Activity date: 04/14/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by VLEON1 - CONTINUE 10090 E DREXEL RD} ; {Activity date: 03/31/2021; Status: Continued; Inspector: DROBERTS; Comment: Entered by RSALDAT1 - 5750 CONTINUED, NO CONCERNS NOTED DURING THIS INSPECTION} ; {Activity date: 03/31/2021; Status: Continued; Inspector: DROBERTS; Comment: Entered by RSALDAT1 - 5700 CONTINUED, NO CONCERNS NOTED DURING THIS INSPECTION} ; {Activity date: 03/31/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by RSALDAT1 - 10220 CN} ; {Activity date: 03/31/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by RSALDAT |
Completed Inspections
Permit Status: Complete
Permit Number: DP20-0080
Permit Description: SITE/GRADING/SWPPP- Encantada at Saguaro Trails, multi-family residential.
Total Completed Inspections - 7
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/07/2021 | SITE - Stormwater Setup and Controls | Passed | {Activity date: 09/07/2021; Status: Approved; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - 09150. 09152. Approved.} ; {Activity date: 01/12/2021; Status: Approved; Inspector: MEHERNANDEZ; Comment: Entered by RSALDAT1 - 5750 S. HOUGHTON RD 9152 (STORMWATER INSTALL OF CONTROLS) NEEDS TO PALCE WATTLES AROUND THE STOCKPILE MAINTAIN TRACK OUT ROCK.} ; {Activity date: 01/12/2021; Status: Approved; Inspector: MEHERNANDEZ; Comment: Entered by RSALDAT1 - 5700 S HOUGHTON RD 9152 (STORMWATER INSTALL OF CONTROLS) NEEDS TO PALCE WATTLES AROUND THE STOCKPILE MAINTAIN TRACK OUT ROCK. } ; {Activity date: 01/12/2021; Status: Approved; Inspector: MEHERNANDEZ; Comment: Entered by RSALDAT1 - 10220 E. DREXEL RD 9152 (STORMWATER INSTALL OF CONTROLS) NEEDS TO PALCE WATTLES AROUND THE STOCKPILE MAINTAIN TRACK OUT ROCK.} ; {Activity date: 01/12/2021; Status: Continued; Inspector: MEHERNANDEZ; Comment: Entered by RSALDAT1 - 10090 E DREXAL RD. 9152 (STORMWATER INSTALL OF CONTROLS) NEEDS TO PALCE WATTLES AROUND THE STOCKPILE MAINTAIN TRACK OUT ROCK.} |
|
09/07/2021 | PDSD Engineering Division Pre-Construction SITE | Passed | {Activity date: 09/07/2021; Status: Approved; Inspector: BBENEDON; Comment: Entered by RSALDAT1 - 09150. 09152. Approved.} ; {Activity date: 12/02/2020; Status: Approved; Inspector: RLEDONNE; Comment: Entered by PAHUMAD1 - Approved. Met with Danny and two new superintendence for The job. Went over calling in every two weeks for a follow up stormwater. Property line in is what we look at. Providing stormwater controls before starting grubbing have us come back to look at controls in place. } ; {Activity date: 12/02/2020; Status: Approved; Inspector: RLEDONNE; Comment: Entered by PAHUMAD1 - Approved. Met with Danny and two new superintendence for The job. Went over calling in every two weeks for a follow up stormwater. Property line in is what we look at. Providing stormwater controls before starting grubbing have us come back to look at controls in place. } ; {Activity date: 11/17/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by PAHUMAD1 - Continue. Phone message was to set up preconstruction meeting with engineering and preconstruction meeting for site sewer. Past phone number onto Dave Roberts to set up meeting and get with Armando to have combined preconstruction meeting.} |
|
11/15/2022 | PDSD Site/Engineering Division - NPPO | Passed | ||
11/15/2022 | ENGR Engineering Final | Passed | ||
11/15/2022 | ENGR Grading Final | Passed | ||
11/15/2022 | SITE - Stormwater Final Inspection | Passed | ||
11/15/2022 | COT - ENGR - Signage Final | Passed | N/A |