Permit: DP20-0007
Permit Details
Apply Date:
01/09/2020
Applicant:
Eric Cheney
Description:
TENTATIVE PLAT/GRADING/SWPPP - Saguaro Trails, Block 6. Residential Lots 1-213. CA "B" (drainage), "
Permit Reviews
Permit Number - DP20-0007
Permit Status: Issued
Permit Description: TENTATIVE PLAT/GRADING/SWPPP - Saguaro Trails, Block 6. Residential Lots 1-213. CA "B" (drainage), "
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
01/09/2020 | DEV PKG - OK TO SUBMIT | 01/14/2020 | COMPLETED |
01/14/2020 | TENTATIVE PLAT REVIEW | 02/20/2020 | COMPLETED |
03/31/2020 | TENTATIVE PLAT REVIEW | 05/06/2020 | COMPLETED |
05/12/2020 | TENTATIVE PLAT REVIEW | 05/26/2020 | COMPLETED |
Outstanding Inspections
Permit Status: Issued
Permit Number: DP20-0007
Permite Description: TENTATIVE PLAT/GRADING/SWPPP - Saguaro Trails, Block 6. Residential Lots 1-213. CA "B" (drainage), "
Total Outstanding Inspections - 5
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/12/2022 | SITE - Stormwater Follow-up | N/A | Complete (Recurring) | {Activity date: 07/12/2022; Status: Continued; Inspector: DROBERTS; Comment: Entered by NGARCIA3 - IS CONTINUED, NO CONCERNS AT THIS TIME.} ; {Activity date: 06/30/2022; Status: Continued; Inspector: DROBERTS; Comment: Entered by RSALDAT1 - NO CONCERNS AT THIS TIME} ; {Activity date: 05/24/2022; Status: Continued; Inspector: DROBERTS; Comment: Entered by NGARCIA3 - NO CONCERN AT THIS TIME} ; {Activity date: 03/29/2022; Status: Continued; Inspector: DROBERTS; Comment: Entered by RSALDAT1 - CONTINUED, NO CONCERNS AT THIS TIME} ; {Activity date: 03/22/2022; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by VVERA1 - CN/ GOOD TO POUR THE HEADWALLS G AND D.} ; {Activity date: 03/17/2022; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by NGARCIA3 - CN/ OK TO POUR TH FOOTER FOR HEADWALLS 9801 E DREXEL RD} ; {Activity date: 03/16/2022; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by VVERA1 - CN /FORMING FOR HEADWALLS H,F .GOOD TO POUR .} ; {Activity date: 03/11/2022; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by RSALDAT1 - 9154 (STORMWATER FOLLOW-UP INSP) IS PARTIAL, NO CONCERNS AT THIS TIME} ; {Activity date: 12/20/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by RSALDAT1 - CN/ GOOD AT IS TIME} ; {Activity date: 06/18/2021; Status: Continued; Inspector: DROBERTS; Comment: Entered by VLEON1 - CONTINUED AT THIS TIME, NO CONCERNS NOTED DURING THIS INSPECTION} ; {Activity date: 04/28/2021; Status: Continued; Inspector: MHERNANDEZ; Comment: Entered by VLEON1 - } |
10/26/2022 | SITE - Stormwater Setup and Controls | N/A | Not Ready | |
10/26/2022 | PDSD Engineering Division Pre-Construction SITE | N/A | Not Ready | |
10/27/2022 | COT - ENGR - Signage Final | N/A | Not Ready | |
04/25/2023 | ENGR Grading Final | N/A | Partial Pass | Call David Roberts for a final on this project |
Completed Inspections
Permit Status: Issued
Permit Number: DP20-0007
Permit Description: TENTATIVE PLAT/GRADING/SWPPP - Saguaro Trails, Block 6. Residential Lots 1-213. CA "B" (drainage), "
Total Completed Inspections - 9
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/29/2023 | SITE - Stormwater Setup and Controls | Passed | ||
11/29/2023 | PDSD Engineering Division Pre-Construction SITE | Passed | ||
02/06/2024 | COT - ENGR - Signage Final | Passed | ||
02/13/2024 | PDSD Site/Engineering Division - Landscaping | Passed | ||
02/13/2024 | PDSD Site/Engineering Division - NPPO | Passed | ||
02/13/2024 | ENGR Grading Final | Passed | ||
07/16/2024 | COT - ENGR - Site - Assurance Release | Passed | The items from the 2/13/2024 inspection have been completed to satisfaction. | |
07/16/2024 | SITE - Stormwater Final Inspection | Passed | ||
07/16/2024 | ENGR Engineering Final | Passed | The items from the 2/13/2024 inspection have been completed to satisfaction. |