Permit: DP20-0007

Parcel: 141020230


Addresses:

9801 E DREXEL RD


Inspection Status: Not Ready

Inspection History: ENGR Grading Final

Permit Number - DP20-0007

Inspection Description - ENGR Grading Final

Inspection Status - Not Ready

Date Description Inspector Results Comments
10/27/2022 ENGR Grading Final Not Ready
10/27/2022 ENGR Grading Final Not Ready
10/27/2022 ENGR Grading Final Not Ready
10/14/2022 ENGR Grading Final BBENEDON Not ready for Inspection Entered by NGARCIA3 - Not ready. Marco with dirt works.
07/12/2022 ENGR Grading Final DROBERTS Partial Approval Entered by NGARCIA3 - IS PARTIAL, OK TO PLACE CONCRETE FOR THE HEADWALLS FOR THE RCP'S Located ON THE EAST SIDE OF THE SOUTHERN HALF OF THIS PROJECT
05/26/2022 ENGR Grading Final MHERNANDEZ Continued Entered by VVERA1 - CN /INSPECTION FOR THE R.C.P. AND THE HEADWALL .CONTRACTOR NOT ON SITE .INFORMED MARCO ABOUT THE R.C.P THAT INSTALLED THAT THE TOE DOWN HAS NO REBAR IN IT NEED TI BE RE -INSPECTED .
10/20/2022 ENGR Grading Final MHERNANDEZ Continued Entered by NGARCIA3 - CN /CUTTING THE ROAD IN BETWEEN THE TWO SUBDIVISIONS.
10/14/2022 ENGR Grading Final BBENEDON Partial Approval Entered by NGARCIA3 - Partially approved. Subgrade.
07/12/2022 ENGR Grading Final DROBERTS Continued Entered by NGARCIA3 - IS CONTINUED, CREWS ARE COMPLETING THE FORM PLACEMENT FIR THIS DRAINAGE STRUCTURE LOCATED ON THE EAST SIDE OF THIS SUBDIVISION.
06/30/2022 ENGR Grading Final DROBERTS Continued Entered by RSALDAT1 - MET WITH THE DEVELOPER AND LOOKED AT THE DETAILS FOR THE HEAD WALLS., CLEAN THE FOOTERS, PLACED THE FORMS AND REBAR, AND THEN TAKE PHOTOGRAPHS FOR APPROVAL PRIOR TO POURING THE CONCRETE
05/24/2022 ENGR Grading Final DROBERTS Continued Entered by NGARCIA3 - CREWS ARE WORKING ON FORMING FOR HEADWALLS ALONG THE EAST SIDE OF THIS PROJECTS
12/20/2021 ENGR Grading Final MHERNANDEZ Continued Entered by RSALDAT1 - CN FORMING FOR SIDEWALK SCUPPER.
06/18/2021 ENGR Grading Final DROBERTS Continued Entered by VLEON1 - CONTINUED, CREWS CONTINUE TO WOR ON ROUGH GRADING OF THE PADS, ROADWAYS, AND UTILITY INSTALLATION
04/28/2021 ENGR Grading Final MHERNANDEZ Continued Entered by VLEON1 -
02/06/2024 ENGR Grading Final Partial Pass Basins are holding water need to be resolved. Because it’s past the 24 hour limit per City Of Tucson spec.
02/13/2024 ENGR Grading Final Passed
04/25/2023 ENGR Grading Final Partial Pass Call David Roberts for a final on this project
11/29/2023 ENGR Grading Final Passed
11/29/2023 ENGR Grading Final Passed
11/29/2023 ENGR Grading Final Passed